Download presentation
Presentation is loading. Please wait.
Published byBritton Cobb Modified over 6 years ago
1
ZNY DIM Briefing PDRR, Bedminster Airspace Date: 5/25/2017
Presented to: DIM Participants Presented by: James C. Schultz III
2
BEDMINSTER AIRSPACE This is a General overview:
Provides a visual slide of affected routes Attached are actual advisories including planned updates for next use, will be sent out Any specific questions can be answered by ZNY TMU Office: Bob Ocon Jim Schultz
10
Pre Departure Reroutes (PDRR)
11
PDRR ZNY will turn on PDRR when it becomes functional
FRC will be in remarks on all PDRR reroutes till EAE200 CDR and remarks needs a TFMS build that will be determined We will explore uses to improve routing options in the NE
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.