Presentation is loading. Please wait.

Presentation is loading. Please wait.

AASHTOWare Integrated system from project development through closeout. KDOT decided to go this direction in about 2014.

Similar presentations


Presentation on theme: "AASHTOWare Integrated system from project development through closeout. KDOT decided to go this direction in about 2014."— Presentation transcript:

1 AASHTOWare Integrated system from project development through closeout. KDOT decided to go this direction in about 2014.

2 American Association of State Highway and Transportation Officials
AASHTO American Association of State Highway and Transportation Officials

3 Projects Preconstruction – KDOT has used this module for decades. This includes proposal development. Bids – This will replace Expedite. KDOT implemented in 2018. Civil Rights Labor (CRL) - KDOT implemented March 1, 2018. Construction & Materials (C&M)

4 CRL DBE Portion Bidder Quoter Contractor Certified Payrolls
Subcontractor Payments (Formally 1010 Form)

5 Construction & Materials
Pilot in 2019 for all Districts Pilot is dual entry pilot (AASHTOWare Projects and CMS) Implementation in

6 D1 Projects D2 Projects 7 TE 0455-01 Streetscape
35-46 KA Bridge KA Culvert D2 Projects 56-57 KA PCCP 81-79 KA Bridge

7 D3 Projects 24-33 KA 5018-01 Seal - Tied 84-33 KA 5019-01 Seal - Tied
70-32 KA PCCP

8 D4 Projects D5 Projects 69-54 KA 5102-01 HMA OL
66-11 KA Bridge Repair D5 Projects KA PCCP Patch – Tied KA PCCP Patch – Tied 78 U Hike & Bike Trail

9 D6 Projects 96-51 KA HMA OL 50-29 KA Seal

10 Contractor Impact during Pilot.
1 or 2 Contractor to do the following in system Sign Change Order Enter Subcontractors (attach 260 & tax certificate)

11 Materials Input all KDOT testing Input all Contractor QC testing
Consultants MRC Structures and Geotechnical Field and District Labs Quality Assurance Independent Assurance Regional Labs Input all Contractor QC testing

12 Questions Bureau of Construction and Materials Sue Eiseman, P.E. – ABC - Construction Rick Barezinsky, P.E. – ABC - Materials


Download ppt "AASHTOWare Integrated system from project development through closeout. KDOT decided to go this direction in about 2014."

Similar presentations


Ads by Google