Presentation is loading. Please wait.

Presentation is loading. Please wait.

A-1 RF gun Takuya Natsui.

Similar presentations


Presentation on theme: "A-1 RF gun Takuya Natsui."— Presentation transcript:

1 A-1 RF gun Takuya Natsui

2 A-1 beam line

3 AT line (Thermal gun line)
A1 line (RF gun line)

4

5 AT line A1 line to A1 line from AT line KL_A1_A KL_A1_B B RF Window
AC_AT_2 GV_AT_2 SC_AT_1 KLY gallery tunnel IP_AT_L RF Window IP_A1A_KA IP_A1A_KB 真空マニホールド IP_A1A_KC QM_ AT_01,02,03 SC_AT_0 BX/Y_AT_0 AT_11,12,13 AC_AT_1 SC_AT_2 B IP_A1A_KD Att &Phase Shifter AT line Phase Shifter KL_A1_A to A1 line PB A1 line QM_ A1_01,02 A1_G1,G2 GV_A1_RG SC_A1_G BX/Y_A1_G SC_A1_0 KLY gallery tunnel IP_A1_G2 IP_A1_RC IP_A1_G1 IP_A1B_KD IP_A1B_KA IP_A1B_KB RF Window IP_A1B_KC BM_A1_0 GR_A1 IP_A1_LA IP_A1_LB A1_11,12,13 SC_A1_1 BM_A1_C1~C4 GV_A1_C4 AC_A1_1 Att &Phase Shifter KL_A1_B Dummy IP_A1A_KE 75L from AT line RF Window

6 Cathode plug

7 Used cathode plug damage (till 2015 Feb)
Laser miss operation abrasion damage Break down damage

8 Cathode fix improvement
Current cathode fix New cathode fix shrinkage fit No interspace dimension tolerance is required

9 New cathode installed to used cavity
No interspace Installed to used cavity

10 Beam operation

11 Dummy road conditioning
Conditioning log 2015/9/25 2015/10/15 Dummy road conditioning 18 MW achieved. The last operating period, 12 MW was maximum. Shrinkage fit and no miss-operation is necessary.

12 Laser injection to RF gun
2 w telescope BBO 4 w

13 laser 258 nm : 100 uJ nC Q.E. = 4.4 x 10-5

14 We achieved two days stable operation.
Recent operation log Disk amplifier is damaged Fix BPM error We achieved two days stable operation. (0.7 +/-0.3 nC)

15 0.7 nC 0.9 nC Beam charge is reduced at accelerating structure.
Bunch length is too long. 0.7 nC 0.9 nC Bunch length measurement and bunch length control is required


Download ppt "A-1 RF gun Takuya Natsui."

Similar presentations


Ads by Google