Presentation is loading. Please wait.

Presentation is loading. Please wait.

<month year> <May 2018>

Similar presentations


Presentation on theme: "<month year> <May 2018>"— Presentation transcript:

1 doc.: IEEE 802.15-<15-18-0200-00-010a>
<month year> <May 2018> Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG10a Proposal to re-use P2P Path List] Date Submitted: [6 May 2018] Source: [Charlie Perkins] Company [Futurewei] Address [2330 Central Expy, Santa Clara Ca, USA] Voice:[ ] Re: [Opening report for TG10a meeting May 2018 Interim Session.] Abstract: [TG10a Proposal to re-use P2P Path List] Purpose: [Fulfillment of submission deadline for new solution approaches] Notice: This document has been prepared to assist the IEEE P It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P <Charlie Perkins>, <Futurewei>

2 Proposal to re-use P2P Path List
doc.: IEEE < a> <month year> April 19 <May 2018> Proposal to re-use P2P Path List First proposal: create new data structure in MT P2P Path List already does exist, already requires correction, and can resolve a problem with relatively minor textual updates Also incorporate other corrections as noted that don’t depend on whether data is in new or re-purposed structure Slide 2 <Charlie Perkins>, <Futurewei> Page 2

3 P2P path list (Table 5-1, pg. 42)
<May 2018> P2P path list (Table 5-1, pg. 42) Type: List of P2P paths Valid range: List of the elements of a P2P path defined in Table 5-3 Description: List of P2P paths available through the current neighbor. Omitted if ondemand P2P route discovery or storing mode are disabled. Retrieved from IE: P2P-RQ IE, P2P-RP IE Condition to record: P <Charlie Perkins>, <Futurewei>

4 Pre-draft draft is available
<May 2018> Pre-draft draft is available Searched for all instances of P2P Path List, analyzed what is needed for textual update (DCN a) [In Process] Merge in relevant corrections from previous study (DCN a) Can probably move quickly towards circulating a draft document <Charlie Perkins>, <Futurewei>


Download ppt "<month year> <May 2018>"

Similar presentations


Ads by Google