Download presentation
Presentation is loading. Please wait.
1
ENGINEER EQUIPMENT INSTRUCTION COMPANY
FY CCRB SCHEDULE 1ST Trimester 2ND Trimester 3RD Trimester 4TH Trimester 5TH Trimester 6TH Trimester Eng Equip Opr A1613F1 (1345 BASIC) A16ACX1 (1345 NCO) June Eng Equip Mech A1613B1 (1341 BASIC) A16ACU1 (1341 NCO) Jun Engineer Asst A1614D1 (1361 BASIC) A16EAV1 (1361 NCO) Aug Eng Equip Chief A1613E1 (1349 CHIEF) Dec Eng Equip Officer A16ACN1 (1310 WO) Feb APR-JUL AUG-NOV DEC-MAR APR-JUL AUG-NOV DEC-MAR 03/19/2018
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.