Presentation is loading. Please wait.

Presentation is loading. Please wait.

Taskforce „TT Quality“: Report from First Workshop (short)

Similar presentations


Presentation on theme: "Taskforce „TT Quality“: Report from First Workshop (short)"— Presentation transcript:

1 Taskforce „TT Quality“: Report from First Workshop (short)
Vienna, 15 February 2017

2 Initial situation and taskforce‘s objective
RUs/Applicants have received offers with poor quality for TT 2017 The RUs complain that offers are: Inconsistent Contradictory Partially nonsense Not harmonised Highly complex and require huge efforts to get „deciphered“ After common analysis with RUs the PCS Team detected 6 major reasons for the poor quality (the following examples are actual dossiers with RFC involvement) Objective of the taskforce’s workshop: Create concepts with countermeasures to the current lack of quality in the international timetables offered via PCS. 15 February 2017

3 Detected reasons for poor quality offer
Negative border times Offers as attachment Unreadable dossiers Different borders in the offer Difference in the offer between the PaP and the tailor-made Difference between PCS and the national system 15 February 2017

4 Approach at the first taskforce workshop
Agreement on the scope of measures: RFCs (with expected positive effects on other international timetabling) Definition of terms (e.g. what is „quality in path offers“) Analysis the 6 defined problems and compare with RFCs‘ products (e.g. PaPs, feeder/outflow) Indication of source problems Creation of measures for each source problems, including implementation time 23 measures were found as ongoing or for short, mid, or long-term implementation Agreement on next steps 15 February 2017

5 Next steps The RNE Managing Board will be asked to agree on a project „TT Quality“ on 16 February 2017 Philipp Koiser will propose the following project timeline: 21 March 2017: Kick-off meeting and start of implementation of measures 4 May 2017: Presentation of intermediate results to the GA June 2017: presentation of proposal at the next High Level IM meeting November 2017: Finalization of short- and mid-term measures and action plan for long-term measures 6 December 2017: Approval of the Action Plan by the GA 15 February 2017


Download ppt "Taskforce „TT Quality“: Report from First Workshop (short)"

Similar presentations


Ads by Google