Download presentation
Presentation is loading. Please wait.
1
Challenges in determination of JI projects.
JI Technical workshop Miguel Rescalvo Santandreu 16 October 2007
2
JI. Experience so far… © Det Norske Veritas AS. All rights reserved
10 April 2019
3
JI. Experience so far… © Det Norske Veritas AS. All rights reserved
10 April 2019
4
Challenges in determination of JI projects.
Experience so far… DETERMINATION PITFALLS. VERIFICATION PITFALLS. LESSONS FROM CDM © Det Norske Veritas AS. All rights reserved 10 April 2019
5
Pitfalls during determination
Project concept Track 1 vs Track 2. Early credits / late credits. LoA?. Double counting methodologies JI pipeline. Deviations. No properly justified/ elaborated. New methodologies. Not detailed. Emission factors. ACM0002 and EF calculated locally. . Additionality. No need to apply the add tool does not mean everything additional !!! Lack of evidences. IRR benchmarks. Pdd Project specific methodologies / deviations. Monitoring details. © Det Norske Veritas AS. All rights reserved 10 April 2019
6
VERIFICATION PITFALLS
LESSONS FROM CDM © Det Norske Veritas AS. All rights reserved 10 April 2019
7
Verification pitfalls
© Det Norske Veritas AS. All rights reserved 10 April 2019
8
Verification pitfalls
© Det Norske Veritas AS. All rights reserved 10 April 2019
9
Verification pitfalls. Lessons from CDM
Lack of management of change. Problems related to monitoring equipment. Inconsistency of data. Monitoring reports and documents submitted for verification. © Det Norske Veritas AS. All rights reserved 10 April 2019
10
© Det Norske Veritas AS. All rights reserved
10 April 2019
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.