Quick Response Quality Control QRQC

Similar presentations


Presentation on theme: "Quick Response Quality Control QRQC"— Presentation transcript:

1 Quick Response Quality Control QRQC

2 MANY ISSUES ARE OPEN FOR TOO LONG!
WHY QRQC? HI DOCTOR! I HAD A FEVER 10 DAYS AGO AND WAS NOT FEELING WELL. I AM AFRAID IT WILL COME BACK. WHAT CAN I DO TO AVOID IT? MANY ISSUES ARE OPEN FOR TOO LONG! LET’S COLLECT DATA TO BE REVIEWED AT END OF MONTH FROM HIS DESCRIPTION IT COULD BE HUNDRED OF DISEASES. WHY DID’NT HE COME WHEN HE HAD THE PROBLEM? BUT IF I WANT TO KEEP HIM AS A PATIENT, I WILL HAVE TO GUESS… LET’S APPOINT A PROBLEM SOLVING GROUP... BUT PROBLEM IS GONE… WE CANNOT OBSERVE THE CONDITION OF THE LINE OPERATORS NO LONGER REMEMBER THE DETAILS. 07/09/2001

3 THESE ACTIONS ARE GOOD, BUT… WHAT IS THE RELATIONSHIP?
WHY QRQC? SITE PAQ IMPROVE QUALITY SYSTEM MODIFY QUALITY MANUAL FOR ISO TS CERTIFICATION SQA MONTHLY REVIEW WITH WORST SUPPLIERS PERFORMANCE REPORT SENT AUTOMATICALLY IMPROVE PDCA TRAIN PSG TEAMS IMPLEMENT LOTUS PDCA DATABASE THESE ACTIONS ARE GOOD, BUT… WHAT IS THE RELATIONSHIP? 07/09/2001

4 WHY QRQC? « CAN YOU SHOW ME HOW YOU ARE IMPROVING QUALITY? »
« OH, YES! I WILL SHOW YOU THE RESULTS OF THE PSG THAT WORKED… 3 MONTHS AGO ON … » A FEW EXAMPLES IN SOME AREAS OF THE PLANT… « CAN YOU SHOW ME HOW YOU IMPROVED QUALITY YESTERDAY ON THIS PRODUCTION LINE? » « UH… UH… WHERE IS THE QUALITY ENGINEER?» MANAGEMENT DOES NOT KNOW WHAT HAPPENED YESTERDAY… … AND OFTEN NOTHING HAPPENED! 07/09/2001

5 WHY QRQC? SOMETIMES THEY ARE NECESSARY BUT SOMETIMES… EASY ANSWER AVOIDS HAVING TO DO ANYTHING « TODAY » CHANGE WAS UNDERWAY FOR ANOTHER REASON AND MIGHT NOT BE RELEVANT TO PROBLEM 5’ MEETING AT PLANT LEVEL IN CONFERENCE ROOM, APU MGR TALKS ABOUT HOT ISSUES: WE ‘VE GOT MANY PROBLEMS SINCE A WHILE WITH PART XXXXXX IT’S AGAIN A DESIGN (OR SUPPLIER) PROBLEM! WE HAVE TOLD OPERATORS TO PAY MORE ATTENTION… LET’S MODIFY PRODUCT BUY BETTER PROCESS EQUIPMENT CHANGE SUPPLIER THOSE ACTIONS MAKES US FEEL PROUD OF OUR USE OF PDCA METHOD: THIS IS « REAL » COUNTERMEASURE!!! 5W 2H? GIVE ME BAD PART AND GOOD PART WHAT IS ROOT CAUSE? WHAT IS PROBLEM? WHY ARE YOU SURE COUNTERMEASURE WILL WORK? 07/09/2001

6 WHY QRQC? NO SANGENSHUGI! 5’ MEETING AT PLANT LEVEL
IN CONFERENCE ROOM, APU MGR TALKS ABOUT HOT ISSUES: WE ‘VE GOT MANY PROBLEMS SINCE A WHILE WITH PART XXXXXX IT’S AGAIN A DESIGN (OR SUPPLIER) PROBLEM! WE HAVE TOLD OPERATORS TO PAY MORE ATTENTION… NO SANGENSHUGI! WITHOUT HAVING REVIEWED REAL DATA! GENJITSU – Reality NOT HAVING BEEN ON THE SHOP FLOOR AND WITHOUT TALKING TO OPERATORS! GEMBA - Real Place NOT HAVING COMPARED GOOD AND BAD PARTS! GEMBUTSU - Real Thing WILL YOU SIGN THAT PROBLEM WILL NOT HAPPEN TO-MORROW? 5W 2H? GIVE ME BAD PART AND GOOD PART WHAT IS ROOT CAUSE? WHAT IS PROBLEM? WHY ARE YOU SURE COUNTERMEASURE WILL WORK? 07/09/2001

7 QRQC: BASED ON MANAGEMENT INVOLVEMENT
MANAGEMENT SPEND 20-40’ EVERYDAY TO REVIEW HOW THE ORGANIZATION RESPOND TO QUALITY ISSUES KNOWING WHAT GOES ON REALLY AT ACTOR LEVEL BY LOOKING AT REAL DAILY ISSUES RATHER THAN AT PERIODIC REPORTS PREPARED BY SPECIALISTS HOW EMPLOYEES WORK EVERYDAY? HOW DOES THE ORGANIZATION REACT WHEN A PROBLEM OCCUR? EDUCATING BY CHALLENGING INTERMEDIATE MANAGEMENT LISTEN: SANGENSHUGI CHALLENGE AND VERIFY: SANGENSHUGI IN CASE OF INSUFFICIENT RESPONSE, REQUEST BETTER PROBLEM HANDLING FOR NEXT DAY APPLAUD WHEN TEAMS HAVE SUCCESS: SANGENSHUGI 07/09/2001

8 ORGANIZATION IS QUICKLY RESPONDING TO ISSUES
QRQC: QUICK RESPONSE ORGANIZATION IS QUICKLY RESPONDING TO ISSUES LESS ISSUES OPEN AT SAME TIME PRIORITY ON CUSTOMER ISSUES AND A HANDFUL OF INTERNAL ISSUES IN EACH APU VALIDATED BY MANAGEMENT DAILY PROGRESS 24HR FOR CONTAINMENT, 3 DAYS MAX FOR CORRECTIVE ACTION IMPLEMENTATION ROOT CAUSE ANALYSIS BASED ON REALITY IMAGINATION IS FORBIDDEN! BETTER TO 100% ERADICATE THE MAIN ROOT CAUSE TO-DAY RATHER THAN WAITING FOR 30 DAYS TO HAVE PRODUCT CHANGE, NEW PROCESS EQUIPMENT OR SUPPLIER CHANGE TO SOLVE ALL POTENTIAL ROOT CAUSES 07/09/2001

9 QUICK ASSIGNMENT AND ACTION TO STOP PROBLEM
APU QRQC QUICK ASSIGNMENT AND ACTION TO STOP PROBLEM 07/09/2001

10 IN MOST CASES, PB CAN BE SOLVED WITH SIMPLE APPROACH
APU QRQC EXAMPLE 1 IN MOST CASES, PB CAN BE SOLVED WITH SIMPLE APPROACH 07/09/2001

11 APU QRQC EXAMPLE 2 QUICK ASSIGNMENT TO SOLVE THE ISSUE
PROBLEM IS MORE COMPLEX THAN INITIALLY THOUGHT 07/09/2001

12 APU QRQC EXAMPLE 2 07/09/2001

13 THIS IS DAILY ON JOB TRAINING!
WHY QRQC MEETING? QRQC CORRECTIVE ACTION IMPLEMENTATION CHECK EDUCATE… THIS IS DAILY ON JOB TRAINING! (OJT) Detection Communication Analysis Verification QRQC MEETING APPLAUDE OR REQUEST MORE DATA APPROVE LISTEN AND UNDERSTAND COACH USING SHANGENSHUGI! QRQC ASSIGNMENT SHEET 07/09/2001

14 ONE GOOD WAY TO START QRQC
EACH APU HAS DAILY QRQC MEETING CHAIRED BY APU MGR TO REVIEW CUSTOMER ISSUES RESPONSE TO TOP 3 DEFECTS OF YESTERDAY PSG PROGRESS PLANT MGR AND QUALITY MANAGER TOUR APU QRQC ATTENDING ONE EVERYDAY ON FRIDAY, PLANT LEVEL QRQC TO REVIEW ALL CUSTOMER ISSUES AND FILL-UP WEEKLY REPORT SHARE EXPERIENCE BETWEEN APUs REVIEW TRANSVERSE PSG PROGRESS DOING THIS WILL MAKE YOU REACH LEVEL GREEN ON APU QRQC RODMAP LEVEL YELLOW ON PLANT QRQC ROADMAP 07/09/2001

15 WHO IS ATTENDING QRQC MEETING?
APU QRQC MEETING WITH PLANT MGR CONTROL APU MGR (CHAIRMAN) PLANT MANAGER AND QUALITY MANAGER (ROTATING IN ONE APU QRQC PER DAY) APU QUALITY SUPERVISORS METHOD MAINTENANCE OTHERS AS REQUIRED (SQA, PROJECT TEAM, …) PLANT QRQC MEETING WITH DIV MGR CONTROL PLANT MGR (CHAIRMAN) DIVISION MANAGER AND DIVISION QUALITY MANAGER, (WHEN ON SITE) PLANT QUALITY MANAGER APU MGRS LOGISTICS OTHERS AS REQUIRED (SQA, PROJECT TEAM, …) BRANCH MGR AND BRANCH QUALITY MGR, WHEN ON SITE 07/09/2001

16 QRQC MEETING RESPONSE TO WORDS
I BELIEVE THAT… WHAT IS REALITY? I THINK THAT… PROBABLY… ROOT CAUSE IS… WHY DO YOU SAY SO? SHOW ME DATA! MANY… HOW MUCH? SOMEBODY DID… THEY DID… WHO DID? IT SHOULD… WHAT IS EVIDENCE THAT IT WILL? I DO NOT KNOW… WHY DON’T YOU KNOW? WHEN WILL YOU KNOW? CHALLENGE TO GET PRECISE INFORMATION BUT DO NOT TRY TO CORNER PEOPLE 07/09/2001

17 QRQC at VIDEOTON ? 07/09/2001


Download ppt "Quick Response Quality Control QRQC"