When all the first fix electrical and plumbing is finished the roofers return to fix the ceiling sheeting in place so the plasterers can arrive on site.

Similar presentations


Presentation on theme: "When all the first fix electrical and plumbing is finished the roofers return to fix the ceiling sheeting in place so the plasterers can arrive on site."— Presentation transcript:

1 When all the first fix electrical and plumbing is finished the roofers return to fix the ceiling sheeting in place so the plasterers can arrive on site

2 A start to fitting plasterboard to the ceiling joists

3 A finished ceiling

4 The sheeting for the upstairs roof. Note the insulation
The sheeting for the upstairs roof. Note the insulation. This will be one warm house

5 The joiners also have to return to fix all the door frames in position

6 The start to a door frame

7 Drilling nail holes

8 Assembling the door frame

9 Trimming the frames

10 The finished joint

11 Quietly ensuring all door frames are at the correct height

12 The door frame in position
The door frame in position. Note the space at the bottom for the floor screed and floor insulation