Demonstration of e.City Gold Electric Bus in the Autonomous Region of Madeira
CIVITAS Forum 2018 21 September 2018, Umeå, Sweden GRIM ROOM Fábio Pereira, AREAM Good morning I´m Fábio. I´m from AREAM This demonstration the presentation will address
2
Demonstration programme and specifications of electric bus
During one month, the bus was in operation in 10 different passenger transport services of three public transport operators of the Autonomous Region of Madeira, two in operation in Madeira and one in Porto Santo. Methodology For each test, data was collected on the battery’s state of charge (as a percentage of battery charge available), kilometres covered and the altitude. Use of slow charger of 11kW.The charging was performed 40% during the day (between morning and afternoon service) and 60% overnight. The performance of the electric bus was evaluated and compared to a diesel-run bus and to a natural gas-run bus. Specifications of electric bus (e.city Gold- Caetanobus) Low-floor, 12m, 88 passenger, 160kW Nm (nominal torque) Nm (peak torque) 85 kWh (LTO -Lithium Titanate Oxide) Civitas Forum 2018• • Umeå
3
Difference in altitude (m) Energy consumption (kWh/km)
Results of demonstration Bus performance in some services and in comparison with diesel and natural gas technologies Service Difference in altitude (m) Energy consumption (kWh/km) CO2 emissions (g/km) Electric Diesel CNG Aerobus 331 1,02 4,62 6,47 451 1234 1307 Porto Santo 166 0,74 7,2 10,1 396 1919 2033 Monte 620 1,43 7,33 10,26 634 1957 2073 Ponta da Cruz 65 0,91 6,25 8,75 394 1669 1768 Civitas Forum 2018• • Umeå
4
Accumulated investment, energy and maintenance costs
Financial analysis - plug-in charging (day and overnight) Accumulated costs and savings during 20 years – Route 2 -Ponta da Cruz - Scenario without grant Year Accumulated investment, energy and maintenance costs Accumulated savings Electric Bus CNG Bus Diesel Bus Electric Bus compared to Diesel CNG Bus compared to Diesel Electric Bus compared to CNG € € € € € € 1 € € € € € € 2 € € € € € € 3 € € € € € € 4 € € € € € € 5 € € € € € € 6 € € € € € € 7 € € € € € € 8 € € € 4 753 € € € 9 € € € € € € 10 € € € € € € 11 € € € €* € € (…) …… ….. 20 € € € € € € * Year of purchase of new battery pack (50 000Eur)
5
Accumulated investment, energy and maintenance costs
Financial analysis - plug-in charging (day and overnight) Accumulated costs and savings during 20 years - Route 2 Ponta da Cruz - Scenario with grant* Year Accumulated investment, energy and maintenance costs Accumulated savings Electric Bus CNG Bus Diesel Bus Electric Bus compared to Diesel CNG Bus compared to Diesel Electric Bus compared to CNG € € € € € € 1 € € € € € 3 445 € 2 € € € € 1 223 € € 3 € € € € € € 4 € € € € € € 5 € € € € € € 6 € € € € € € 7 € € € € € € 8 € € € € € € 9 € € € € € € 10 € € € € € € 11 € € € €** € € (…) …… 20 € € € € € € * 85% of non-refundable grant calculated on overcost of alternative bus against conventional bus (diesel) ** Year of purchase of new battery pack (50 000Eur) Civitas Forum 2018• • Umeå
6
Environmental analysis Comparison of avoided emissions during 20 years between the three technologies Technology Ponta da Cruz Monte CO2 (t) NOx (kg) PM Emissions Electric Bus compared to Diesel Bus 1 330 5 496 123 1 413 6 349 110 CNG Bus compared to Diesel Bus -99 2 126 153 -116 2 499 160 Electric Bus compared to CNG Bus 1429 3 370 -29 1529 3 850 -50 It is worthy to note that the electric bus does not emit atmospheric emissions in an urban environment and has a positive impact in improving the air quality and public health of cities, in addition to producing less noise. Civitas Forum 2018• • Umeå
7
Adaptation to the Autonomous Region of Madeira
Strong points Maximum torque as soon as acceleration occurs. Smooth acceleration. Easy battery charging procedure. Points to improve Increase approach and departure angles. Adapt the bus dimensions to some services. Increase the power and torque for more demanding services. Ensure diverse compatibility of battery charging system with other available systems (charging by pantograph or by cable). Civitas Forum 2018• • Umeå
8
E.Charging systems solutions for electric buses
Font: Pictures Siemens Opportunity charging (end-stop of the route) kW Plug-in charging (station, charging overnight) 60-80 kW Plug-in charging (station, during the day, between peak hours) kW Manual (needs human intervention) On end-stop (as a measure of precaution, it is necessary to have two pantographs) Civitas Forum 2018• • Umeå
9
Plug-in charging (overnight)
(7:00- 9:30 AM; 12:30-14 PM: 30; 17: 30-20:00 AM); Note: In order to make the most of the slow charging at the station, one should take advantage of the empty and super-empty hours. 55% of pantograph charging 45% of plug-in charging Considering only pantograph charging costs Annual energy costs of two routes - 5 electric buses Opp charging for two routes (daily charging, without night charging with plug-in charging)- 5 buses (Energy: € (245 GWh ) Power transformation station maintenance: 3 600€ Exploration: 130 € Maintenance: € Total cost: € (0,23€/kWh) Diesel buses for the same service kilometers Energy costs: € Comparison between energy costs (electricity vs diesel) € -37% Plug-in charging (overnight) Energy costs: Electric Bus Diesel Bus Opportunity charging € (0,23€/kWh) € Plug-in charging (overnight) € (0,082€/kWh) Total costs € Reduction of costs between electric and diesel bus -66,26% Civitas Forum 2018• • Umeå
10
Accumulated investment, energy and maintenance costs
Financial analysis Accumulated costs and savings during 20 years – Route 2- Scenario without grant Year Accumulated investment, energy and maintenance costs Accumulated savings Electric Bus CNG Bus Diesel Bus Electric Bus compared to Diesel CNG Bus compared to Diesel Electric Bus compared to CNG € € € € € € 1 € € € € € € 2 € € € € € € 3 € € € € € € 4 € € € € € € 5 € € € € € € 6 € € € € € € 7 € € € € € € 8 € € € € € € 9 € € € € € € 10 €* € € € € € 11 € € € €* € € (…) …… ….. 20 € € € € € € For km/year per bus 55% of pantongraph charging 45% of plug-in charging The cost of purchasing and installing the two pantographs shall be of the responsibility of the operator of the public charging station. These systems can be financed by regional operational funds. * Year of purchase of battery pack (50 000Eur)
11
Conclusions The demonstration revealed that the electric bus is technically feasible and cost-effective and environmentally advantageous in relation to diesel and natural gas. The planned services were well performed by the bus, presenting appropriate power and torque for the required demand level. The electric bus, compared to the diesel bus, achieved an 86% saving in energy costs (around 50 Eur/100km) and a 75% reduction in CO2 emissions. In the 20 year analysis with plug-in charging (overnight), in a scenario without a grant, the electric bus becomes more economically advantageous compared to the diesel bus, starting from the 8th year, at 2017 prices. In the 20 year analysis with plug-in charging and opportunity charging, the electric bus becomes more economically advantageous compared to the diesel bus, starting from the 8th year, at 2017 prices. End-stop charging in the local context will be the most viable option for better quality of public transport operator service. Standardization of opportunity charging and plug-in charging is required for compatibility with electric buses and battery manufacturers. Civitas Forum 2018• • Umeå
12
e.City Gold electric bus experience in Madeira and Porto Santo
(short version) Click to download the “Electric bus report-EN” Pilot test video Civitas Forum 2018• • Umeå
13
Thank you! Fábio Pereira Contact Details AREAM www.aream.pt