Download presentation
Presentation is loading. Please wait.
1
Level 1
2
John Smith 29 08 06
3
Destroyed A-SATS report form is
All Safety Survey Scales MUST be entered correctly for each level undertaken 60 90 T L R N U V A-SATS report form is Destroyed A-SATS positive & negative indicators are Kept with participant’s competency records
4
Paul Jones Paul Jones 01 09 06 John Smith John Smith 01 09 06
5
1. Complete Program Manager’s number 2. Date TAS faxed
001 01 09 06 John Smith 09 12 72 XYZ Pty Ltd Plant Operator Construction 154 Taylor Street, Seacomb Heights SA 5035 1. Complete Program Manager’s number 2. Date TAS faxed 3. All candidate’s information entered 4. Code of Practice given (AQTF Requirement) 5. Permission to (VETAB Requirement) 6. Must be if it is a management debrief
6
Paul Jones Paul Jones 1. if going to Level 2
60 90 T L R N U V 29 08 06 Paul Jones 01 09 06 Paul Jones 01 09 06 1. if going to Level 2 2. Transfer all A-SATS scores and the date the survey was conducted 3. Self scoring (used for self scoring options) 4. Write in assessor’s name in full, sign and date evidence was collected 5. C for Competent NYC if not yet competent
7
Fax TAS to PAQS RTO Or TAS to PAQS RTO We will post out the Statement of Attainment or Certificate
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.