1 Project Nexus Workgroup
Reconciliation Meeting 6 24th October 2011 11/04/2019

2 Objectives of the Workgroup
Determine detailed business requirements for future Reconciliation of Meter Points Consider/review comments made during the Project Nexus consultation and the high level principles agreed at the Principle Workgroup Develop future state process maps Provide sufficient definition around business rules to: Enable the proposed requirements to be incorporated in Xoserve’s investment decisions, and Support the raising of any UNC Modification Proposals, if required Monitor & align with latest SMIP position Focus will be on requirements for Project Nexus delivery

3 Approach to Workgroup Review; High level Rec principles
Relevant Modifications Agree scope Agree future requirements Develop process maps and detailed business rules Review & ensure alignment with requirements from Settlement Workgroup Continue to monitor and align with SMIP outcomes

4 Scope of “Reconciliation”
Submit Meter Reading to GT Determine Daily Energy Offtaken Apply Scaling Adjustment (smear) Issue Energy Balancing Invoices Collect/Pay Energy Balancing Invoices Submit Meter Reading for Reconciliation Calculate Reconciliation Calculate Reconciliation Neutrality Prepare reconciliation Invoice Issue Reconciliation Invoices Scope of “Reconciliation”

5 Business Issues Raised
Initial Requirements Register Increase scope of meter point reconciliation Improve Filter Failure process Amend USRV filter from TRE to a ZRE filter Raised during Workgroups RbD does not incentivise Shippers to submit reads for SSP Unallocated energy is borne by the SSP market due to RbD – risk for SSP Shippers RbD provides Shippers with limited flexibility RbD does not provide transparency USRVs do not necessarily incentivise shippers to improve the quality of the read & asset information

6 Areas for Discussion Business Requirements Document which details requirements for the following areas (those in red are yet to be discussed & agreed); Periodic reconciliation Daily reconciliation Treatment of re-synchs Re-reconciliation Roll-over tolerances USRV’s (Filter Failures) Reconciliation Scaling Adjustment (Smear) Reconciliation ‘line in the sand’ Transition from an RbD world to Meter Point Rec Reconciliation Communication Treatment of Rec charges following a change in Shipper NDM CSEPs AUGE role

7 Objectives for Today Agree changes made to the previous version of the BRD (V0.4) Review ‘To Be’ Process Models Agree business requirements for the following areas; Reconciliation communication NDM CSEPs (assuming current arrangements apply) Future AUGE role (with respect to the new settlement and reconciliation requirements) Agree next steps Is another meeting required? BRD ready for final review & comments (next meeting 22/11/11) Currently there is not a ‘live’ modification for Meter Point Rec

8 Business Requirements Document
Document details reconciliation processes. Key changes & agreements from the last version (0.4); Reviewed & amended the following sections; Benefits Risks & Issues Dependencies Validation of Reconciliation values Discussed Rec Communication Transition (RbD)