Download presentation
Presentation is loading. Please wait.
Published byJody Jennings Modified over 5 years ago
1
GloSea4 – the new Met Office Hadley Centre seasonal forecast system
Adam Scaife and Alberto Arribas January 2009 © Crown copyright Met Office
2
GloSea3 vs GloSea4 GloSea3 GloSea4 HadCM3 (N48L19 – 1/3L40) HadGEM3
Model HadCM3 (N48L19 – 1/3L40) HadGEM3 (N96L38-ORCA1L42) Initialization Atmos/soil: reconf. of ECMWF 4D-Var Ocean: UM 3D-OI Atmos/soil/sea-ice: reconf. of Met Office 4D-Var Ocean: NEMO 3D-OI IC uncertainties Wind stress and SST perturbations added to a central analysis Weekly lagged approach Model uncertainties None RP + SKEB2 Forecast ensemble 41-members (monthly bursts from 1st ) 30 members (weekly bursts) Hindcast ensemble Run a priori off-line 15-members / 15-years ( ) ERA-40 Run real-time with forecast 10-members / 15-years ( ) ERA-interim © Crown copyright Met Office
3
GloSea4 : System design/infrastructure
Monday ADA(NWP) + ODA Weekly IC N forecasts (6-month) Archiving/post-processing Tue - Sun ADA(NWP) + ODA N forecasts (6-month) Archiving/post-processing FCST Every week Pull together last 4-weeks fcsts/hcst Post-processing Products / web display Every day ‘Weekly’ ICs N forecasts (6-month): Y-years, M-members Archiving/post-processing Off line Continuous ODA (e.g – 1998) ‘Weekly’ Atmos + land.surf. Reanalysis data HCST © Crown copyright Met Office
4
Issues with ICs perturbations
Pert. Members CTRL (Bowler, Arribas and Mylne, MWR) © Crown copyright Met Office
5
Issues with ICs perturbations
Lagged approach GloSea4 to follow a lagged initialization approach Flow dependent perturbations Representing true uncertainty (spatial and magnitude) Current system © Crown copyright Met Office
6
Future upgrade for coupled initialisation and stratosphere
April 2009 Future upgrade System configuration Fcst: 30 members Hcst: 15-yr (most recent years from ERA-Interim); 10 members Hcst: 20-yr; 10 members [cost incr.: x 1.3] Model configuration and resolution HadGEM3 N96L38+ORCA1L42 HadGEM3 N96L85+ORCA1L42 [cost incr.: x 1.6 (with same timestep)] Initialization Atmosphere: reconfiguration of NWP / ERA Ocean: DA: improved covariances Sea-ice: Include assimilation Coupled initialization as described in Anderson et al. (2008). Replacement of NEMO-OI by NEMOVAR Representation of uncertainties ICs: lagged approach Model:RP + SKEB2 Improvement of SKEB2 Post-processing - GloSea3 calibration and display system - Complete MO-EPS Integrated web display system - Improvement of new calibration methods - Improvement of integrated display system Computing cost ~1.5% ~3% © Crown copyright Met Office
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.