Download presentation
Presentation is loading. Please wait.
1
Making sure our lineman get home Safe
2
Best practices for testing Trucks
1 Year If Damaged Suspected or repairs made Bucket Truck Required Digger Truck
3
Best Practices for Testing Grounds and Jumpers
After Every Job 1 Year If Damage Suspected Grounds Optional Recommended Required Jumpers
4
Best Practice for Tools
After Every Job 6 Months 1 Year 2 Years If Damage Suspected Universal Optional Recommended Required Shotgun/ Grip-All Telescoping Insulated Hand tool Ladders Platforms
5
Testing Rubber Goods Chart
30-60 days 90-days 6 months 1 year If Damage Suspected Gloves Optional Recommended Required Sleeves Blankets Line Hose Hoods Boots
6
LOG IN DATE CLASS SIZE COLOR GLOVE NUMBER EMPLOYEE NAME
7
Washing and Drying
8
Visual Inspection
9
OZONE
10
Snag
11
Scratches
13
Dielectric Test
14
Dielectric Test
15
Water Fill
16
Gloves Lowered and Voltage Added
19
Field Inspection Per ASTM Standard F 1236
Glove and Sleeves shall be given a daily visual inspection to check for punctures tears or any other defect that is detrimental to the rubber product’s effectiveness.
20
Glove Rollup Method Step 1 Grasp Cuff Step 2 Roll Cuff Step 3
Entrap Air Step 4 Listen for leaks
21
Making sure our lineman get home Safe
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.