Presentation is loading. Please wait.

Presentation is loading. Please wait.

A joined proposal by CMA, DWD and JMA

Similar presentations


Presentation on theme: "A joined proposal by CMA, DWD and JMA"— Presentation transcript:

1 A joined proposal by CMA, DWD and JMA
WIS Monitoring Pilot A joined proposal by CMA, DWD and JMA

2 Agenda Joined proposal by CMA, DWD and JMA Roadmap
Status GISC Offenbach

3 Joined proposal by CMA, DWD and JMA
The joined proposal builds up on BoM’s initial proposal – published on on TT-GISC and forwarded to TT-DC at the same date The information are provided in 3 JSON files: Monitor.json: GISC metric, URLs centres.json, events.json, additional GISC monitoring site and contacts Centres.json: Metric for Data Centres  feedback from TT-DC already incorporated Events.json: Service messages like maintenance notification, updates, … from all centres  feedback from TT-DC already incorporated Proposal uses statistics provided by ECMWF for the WIS Core network Many elements are optional for easy entrance to demonstration JSON files are described by a schema Currently Monitor.json and Centres.json are updated at 00:00 UTC and Events.json in realtime Files are online available: CMA: DWD: JMA:

4 Roadmap CMA, DWD and JMA suggested the following roadmap
M1: JSON files are available at each GISC – static file is available [19/12/2014] M2: JSON files with real information are available at each GISC [16/01/2015] M3: 1. Version of the dashboard is available [27/2/2015] M4: Test phase of dashboard: Updates are reflect correctly in the dashboards (monitor.json, events.json, centres.json) M5: Demonstration at Congress 25/5 – 13/ or 15/6 – 17/6 EC CMA, DWD and JMA reached M2

5 Status report GISC Offenbach
In addition GISC Offenbach provides a history of all JSON files. They are accessible by Starting from Additional monitoring pages: GISC Offenbach AMDCN OAI Monitor:


Download ppt "A joined proposal by CMA, DWD and JMA"

Similar presentations


Ads by Google