Download presentation
Presentation is loading. Please wait.
Published byŌἈαρών Σπανός Modified over 5 years ago
1
SGN 2010 Annual Tender Interruption Requirements
7th May 2010
2
2010 Interruption Process Scotia Gas Networks publish Final Interruption Requirements 30th April 2010 Xoserve send details of Interruption requirements to Shippers 7th May 2010 Tender window opens Monday 7th June 2010 Tender window closes 5pm Friday 18th June 2010 On or before 30th July 2010 SGN publish results of the Annual tender
3
Interruption Requirements May 2010
Scotia Gas Networks have published it’s Interruption Requirements, details are summarised below or on the SGN website; or contact for assistance Steven Howells tel Scott Duncan tel
4
Final Interruption Requirements
Scotland Zones Final Interruption Requirements Zone Requirements 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 Scotland Zone 1 SOQ Volume (GWh/Day) 3.65 3.99 4.30 4.63 4.95 7.3 7.61 Min No. Int Days 5 Max No. Int Days 52 54 57 59 61 62 65 Scotland Zone 2 0.8 25 36 38 39 41 43 46 Scotland Zone 3 0.7 30 44 53 69 Scotland Zone 4 1 40 82 85 88 90
5
Southern Zones There are currently no Interruption Requirements for the Southern DN. SGN are not therefore accepting Tenders during this annual window for the Southern DN.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.