Presentation is loading. Please wait.

Presentation is loading. Please wait.

Flexible Services iNotice Board Tuesday, February 16, 2016

Similar presentations


Presentation on theme: "Flexible Services iNotice Board Tuesday, February 16, 2016"— Presentation transcript:

1 Flexible Services iNotice Board Tuesday, February 16, 2016
3/14/13 • Watervliet Avenue • cdta.org 1

2 STAR Daily Performance for Tuesday, February 16, 2016
Actual Trips: 315 Actual Passengers Transported: 309 Overall On Time Performance: 93.3% Scheduled: 49.5% Appointment Time: 96.1% Productivity: 1.39 110 Watervliet Avenue • cdta.org 2

3 Advantage Transit Daily Performance for Tuesday, February 16, 2016
Actual Trips: 604 (65%) Actual Passenger Transported: 576 Overall On Time Performance: 98.1% Scheduled: 98.0% Appointment Time: 98.5% Productivity: 9.15 110 Watervliet Avenue • cdta.org 3

4 STAR & Advantage Overall Daily Productivity for Tuesday, February 16, 2016
Total Trips: 919 Trip Per Hour: 6.5 Actual Passengers Transported: 885 110 Watervliet Avenue • cdta.org 4

5 STAR & Advantage Space/Passenger Type Tuesday, February 16, 2016
STAR Transported: Ambulatory Wheelchair / Scooter, Etc Advantage Transported: Ambulatory Wheelchair / Scooter, Etc Total : Ambulatory Wheelchair / Scooter, Etc Note: Passenger count can be higher than trips performed. This includes all passengers except SVA. 110 Watervliet Avenue • cdta.org 5

6 Flexible Services Performance Goals
On Time Performance Goal : 95% Overall On Time Performance (STAR and Taxi) On time is defined as no more than 0 minutes early or 25 minutes late for a scheduled trip Productivity Per Hour Goal : 2.0 Overall Passenger trips per revenue hour (STAR and Taxi) Total revenue hours operated monthly divided by number of completed trips 110 Watervliet Avenue • cdta.org 6


Download ppt "Flexible Services iNotice Board Tuesday, February 16, 2016"

Similar presentations


Ads by Google