Download presentation
Presentation is loading. Please wait.
Published byTonje Merete Mortensen Modified over 5 years ago
1
Idaho Transportation Department (ITD) Chapman Munn Principal Research Analyst Highway Data
Introduction
2
Data Collection Analysis Transportation Performance Management
Introduction
3
Transportation Performance Management
Safety Bridge Pavement System Performance Four components of TPM
4
Geographic Information Systems
Fundamental Concepts Enterprise Databases Geographic Information Systems Technical Employees Automation Manager Support The five fundamental concepts that allowed us to solve the TPM problem
5
Enterprise Databases Oracle DB SQL Server Pavement Data Bridge Data
Safety Data NPMRDS Data Touch on concept of open data Single source of truth Easy access Processing speed Protected information – read access only – admin rights
6
Enterprise Databases Open Data Single Source Secure Data
Processing Speed
7
Geographic Information Systems
Location ArcPY Visualization All data has location Built in analytics tools ArcPY Availability
8
Geographic Information Systems
All data has location Built in analytics tools ArcPY Frame our process internally – solve problem for state - modify code for MPO – scalable
9
Technical Employees Programming GIS Database design Data science
10
Automation Python/R Reproducibility Quality Assurance
Python is a free, modern scripting language R is designed for statistics and analytics
11
Automation Add language name Iterative process Reliability and speed
12
Setting Targets Manager Support Autonomy Team Approach
Frame iterative nature of TPM Generated lots of conversation Policy approach ‘Data informed decisions’
13
Questions? Chapman Munn Chapman.Munn@itd.idaho.gov 208-334-8460
Contact Info Chapman Munn
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.