TONBRIDGE POWER GREEN LINE
parsons 110899 TONBRIDGE POWER GREEN LINE PLAN OF SERVICE PE&C1099.ppt
2
TONBRIDGE POWER GREEN LINE
WECC VOLTAGE CRITERIA SYSTEM INTACT CONDITIONS: MAXIMUM PER UNIT MINIMUM PER UNIT N-1 CONTINGENCY CONDITIONS: MAXIMUM PER UNIT MINIMUM PER UNIT POST CONTINGENCY CONDITIONS: ALL VOLTAGE CHANGES < 0.02 PER UNIT OF PRE-CONTINGENCY LEVEL FOR: 230 KV BUSES BELOW 0.90 PER UNIT 500 KV BUSES BELOW 1.00 PER UNIT
3
TONBRIDGE POWER GREEN LINE
WECC TRANSMISSION INTERCONNECTION CRITERIA N-1 CONTINGENCY CONDITIONS: POWER SYSTEM SHALL BE OPERATED AT ALL TIMES SO THAT GENERAL SYSTEM INSTABILITY, UNCONTROLLED SEPARATION, CASCADING OUTAGES AND/OR VOLTAGE COLLAPSE WILL NOT OCCUR AS THE RESULT OF THE LOSS OF A SINGLE SYSTEM ELEMENT
4
TONBRIDGE POWER GREEN LINE
5
TONBRIDGE POWER GREEN LINE
6
TONBRIDGE POWER GREEN LINE
PLAN 3 – TONBRIDGE SS to GARRISON 230KV System Performance – Voltage Impacts System Intact: – No Significant Voltage problems N-1 Contingencies: Outage of Garrison-Taft 1 & 2, 500 kV Lines with Colstrip ATR With 950 MW WTG on-line – No significant Voltage Impacts Outage of Townsend-Garrison 1 & 2, 500 kV Lines with Colstrip ATR
7
TONBRIDGE POWER GREEN LINE
PLAN 3 – TONBRIDGE SS to GARRISON 230KV System Performance – Impacts on Area Transmission Facilities System Intact: – No Significant Line Loading problems N-1 Contingencies: Outage of Garrison-Taft 1 & 2, 500 kV Lines with Colstrip ATR With 950 MW WTG on-line – Overloaded Hot Springs 500/230 kV transformer 117 % Trip 300 MW WTG at Hay Lake – Hot Springs 500/230 kV transformer still overloaded 104 % Trip 650 MW WTG from Renewable Collector System (RCS) WTG – No significant increases on overloaded area facilities
8
TONBRIDGE POWER GREEN LINE
PLAN 3 – TONBRIDGE SS to GARRISON 230KV System Performance – Impacts on Area Transmission Facilities System Intact: – No Significant Line Loading problems N-1 Contingencies: Outage of Townsend-Garrison 1 & 2, 500 kV Lines with Colstrip ATR With 950 MW WTG on-line – No significant increases on overloaded area facilities Trip 300 MW WTG at Hay Lake – No significant increases on overloaded area facilities Trip 650 MW WTG from Renewable Collector System (RCS) WTG – No significant increases on overloaded area facilities
9
TONBRIDGE POWER GREEN LINE
PLAN 3
10
TONBRIDGE POWER GREEN LINE
11
TONBRIDGE POWER GREEN LINE
PLAN 3A – TONBRIDGE SS to GARRISON 230KV System Performance – Voltage Impacts System Intact: – No Significant Voltage problems N-1 Contingencies: Outage of Garrison-Taft 1 & 2, 500 kV Lines with Colstrip ATR With 300 MW WTG on-line and 300 MW Transfer from Alberta – No significant Voltage Impacts Outage of Townsend-Garrison 1 & 2, 500 kV Lines with Colstrip ATR With 950 MW WTG on-line and 300 MW Transfer from Alberta – No significant Voltage Impacts
12
TONBRIDGE POWER GREEN LINE
PLAN 3A – TONBRIDGE SS to GARRISON 230KV System Performance – Impacts on Area Transmission Facilities System Intact: – No Significant Line Loading problems N-1 Contingencies: Outage of Garrison-Taft 1 & 2, 500 kV Lines with Colstrip ATR With 300 MW WTG on-line and 300 MW Transfer from Alberta – No significant increases on overloaded area facilities
13
TONBRIDGE POWER GREEN LINE
PLAN 3A – TONBRIDGE SS to GARRISON 230KV System Performance – Impacts on Area Transmission Facilities System Intact: – No Significant Line Loading problems N-1 Contingencies: Outage of Townsend-Garrison 1 & 2, 500 kV Lines with Colstrip ATR With 300 MW WTG on-line and 300 MW Transfer from Alberta – No significant increases on overloaded area facilities
14
TONBRIDGE POWER GREEN LINE
parsons 110899 TONBRIDGE POWER GREEN LINE PLAN 3A PE&C1099.ppt 14
15
Tonbridge Switching Station
parsons 110899 TONBRIDGE POWER GREEN LINE Tonbridge Switching Station PE&C1099.ppt 15