Download presentation
Presentation is loading. Please wait.
Published byBraeden Jarrells Modified over 10 years ago
1
Ang Tide Right Vessel for Complex Diving Operations
3
Right Vessel - Right Time Configured for Multi-Purpose Diving Ops –Close In Around the Clock Platform Operations Submarine Cable Installation –Cable Lay Survey & Monitoring –Riser Assembly & Construction Trenching Operations –Diver Hand Held Trenching Capability –Deep Power Trenching ROV Operations –Mini-Survey Operations –Cable Lay In Trench Assessment
9
No Off Shore Complex too Tight Superb DP2 Positioning – Diving Operation, In, Under & Over – 24 Hr Operations – 26 Divers on Multiple Shifts – Three Decompression Chambers – 12 Helium Bottle Assembly – 12 Oxygen Bottle Assembly
16
Trenching / Mat Laying Operations –Monitor Cable –Pipe Line Depth –Pipe Line Crossings –Bottom Mat Lay Downs –Cable Uroduct Application – Top Mat Lay Downs
17
Extreme In Close Support Close In Positioning Allowing Diving Operation Penetration Any Where a Diver Needs to Go
18
Submarine Cable Operations Power & Fiber Optics Extensive Experience in: Submarine Cable Laying Riser Construction Platform Termination Complex Infrastructure Pipe Crossing Protection Mat Positioning & Uroduct Protection
23
And Occasional Toast
24
Pattarozzi Tide Dp Work Horse
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.