Download presentation
Presentation is loading. Please wait.
1
مهندسی مجدد فرآیندهای تجاری
بخش سوم: مدیریت منابع فرآیند Workflow Resource Management
2
Workflow management concepts
A workflow definition is composed out of three parts: process definition: a description of the process itself resource classification: a classification of the resources to be used resource management rules: how to map work onto resources
4
In what order? Pull control
Determined by people, i.e., a "race" for attention. System may "suggest" urgent work items or offer multiple view on the work available. Push control System decides whether the worker can view and/or select multiple work items, i.e., order may be enforced or suggested. In both cases possible queueing disciplines are: FIFO (First In First Out) LIFO (Last In First Out) SPT (Shortest Processing Time) EDD (Earliest Due Date) PRIO (Prioritization based on case attributes)
8
Example (taken from "Operations Management" by Roberta Russell & Bernard W. Taylor)
PROCESSING DUE WorkItem TIME DATE A 5 10 B 10 15 C 2 5 D 8 12 E 6 8 Note that unlike most scheduling problems work items emerge on the fly!
9
FIFO (also known as FCFS)
B C D E FIFO START PROCESSING COMPLETION DUE SEQUENCE TIME TIME TIME DATE TARDINESS
10
EDD C E A D B EDD START PROCESSING COMPLETION DUE SEQUENCE TIME TIME TIME DATE TARDINESS
11
SPT C A E D B SPT START PROCESSING COMPLETION DUE SEQUENCE TIME TIME TIME DATE TARDINESS
12
We will return to the topic of workflow analysis and simulation...
Comparison FIFO EDD SPT AVERAGE AVERAGE NO. OF MAXIMUM RULE COMPLETION TIME TARDINESS WI TARDY TARDINESS We will return to the topic of workflow analysis and simulation...
13
Push versus pull
14
Push control workflow enactment service push to a selected "victim"
15
Pull control workflow enactment service pull selected work items
16
pull control
17
Mosts WFM systems are hybrid, e.g., Staffware
personal queue group queue
18
Who is doing what? Pull control Determined by people, i.e., a "race" among resources. Select to start and/or select to allocate work item. Push control Round robin. Weighted round robin. Shortest queue. Select the most specialized resource (i.e., do not allocate "generalists" unless needed).
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.