Download presentation
Presentation is loading. Please wait.
Published byΧριστόφορος Γούναρης Modified over 6 years ago
1
Comparison of Return Iron from Jay Benesch’s Study
Mock up used for the last several years Return iron resulting from Jay’s study LGC detector included in each model for reference.
2
“Mock-up” Iron and Jay’s Case Study Overlaid
Past structural analysis indicated the thickness of the downstream coil collar needed to be increased. The change is reflected in Jay’s study. This causes an interference with the LGC in it’s current position. End cap extended further downstream
3
Hopeful to avoid major geometry changes to LGC detector
From the LGC page on SoLID wiki (several years old) Create a recess in the iron at the top to allow the mirrors, cones and PMT’s to remain in their current location. We need a CAD file from LGC to look at the feasibility.
4
Extended coil collar and 1st layer of iron denoted in magenta.
5
Cable Routing?
6
Access Holes for Cabling
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.