Presentation is loading. Please wait.

Presentation is loading. Please wait.

Excel Case Study: Plot a piecewise continuous function

Similar presentations


Presentation on theme: "Excel Case Study: Plot a piecewise continuous function"— Presentation transcript:

1 Excel Case Study: Plot a piecewise continuous function
ME 120 Mechanical and Materials Engineering Portland State University

2 Overview Introduce intermediate Excel features
Named cells “if” function Hands-on goal: draw a piecewise continuous function

3 Nomenclature Call the piecewise function V(t)
Ramp between two levels, VA and VB Time span defined by four values, 0, tA, tB and tmax

4 Nomenclature We need an equation for V(t) during the ramp
Use V(t) = a + bt Match endpoints VA = a + btA VB = a + btB

5 Nomenclature Solve for a and b: or


Download ppt "Excel Case Study: Plot a piecewise continuous function"

Similar presentations


Ads by Google