Download presentation
Presentation is loading. Please wait.
Published byVerawati Yuwono Modified over 5 years ago
1
Infrastructure and Structures Around the Pavement
Ian Waugh, Area Manager - Scotland Stuart Davies, Business Development Director
2
Innovating Underground Network Access - Multiduct
1m long sections 4 x sizes (4way, 6way, 9way, 4way XL) HDPE Lightweight (under 20kg) Smooth internal walls Range of accessories
3
Product Advantages Shallow dig Quick to install Deskilled process
NO specialist surround required High crush strength. Robust. Easy cable pulling
4
Health, Safety and Environmental benefits
Reduced need for heavy plant Removes need for import Reuse of site won material Removes lorry movements Lightweight for manual handling Made from recycled material Product is recyclable. Safer, quicker, easier to lay
5
Applications
6
Q&A
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.