Presentation is loading. Please wait.

Presentation is loading. Please wait.

November 1, 2007 In cooperation with:

Similar presentations


Presentation on theme: "November 1, 2007 In cooperation with:"— Presentation transcript:

1 November 1, 2007 In cooperation with:
COSMOS 1.0 QA Criteria November 1, 2007 In cooperation with:

2 COSMOS 1.0 QA Criteria - Function
Is COSMOS 1.0 well-formed software? Assess the JUnits Evaluate the integration tests Evaluate the iteration and milestone close processes Assess the tooling 1/4/ Copyright © 2007 CA, made available under the Eclipse Public License

3 QA Criteria – Holistic Tests
Identify all the end-to-end tests Scalability Performance Concurrency Availability Stress testing 1/4/ Copyright © 2007 CA, made available under the Eclipse Public License

4 COSMOS 1.0 QA Criteria Is COSMOS 1.0 a consumable entity?
Assess case for COSMOS 1.0 to Executive Management Assess package for Adopting Developers Evaluate prerequisite definition Evaluate upgrade and patch process for COSMOS 1.0 1/4/ Copyright © 2007 CA, made available under the Eclipse Public License

5 COSMOS 1.0 QA Criteria Is COSMOS 1.0 an extensible framework?
Assess process for extending framework components Assess process for extending supported platforms / operating systems Evaluate process for reporting bugs Evaluate the RE process 1/4/ Copyright © 2007 CA, made available under the Eclipse Public License

6 COSMOS 1.0 QA Criteria Does COSMOS 1.0 offer good features & reference implementations? Is it easy to deploy the central infrastructure? How hard is it to plug in an MDR? What Data Managers / MDR types are supported out of the box? 1/4/ Copyright © 2007 CA, made available under the Eclipse Public License


Download ppt "November 1, 2007 In cooperation with:"

Similar presentations


Ads by Google