Download presentation
Presentation is loading. Please wait.
1
SWE 2.0 – Current Status of Standards
Johannes Echterhoff
2
SWE 2.0 Current Status & Timeline
Jul 2010 Aug 2010 Sep 2010 Oct 2010 Nov 2010 Dec 2010 > Dec 2010 SWES 2.0 (RFC done) finalization work adoption vote spec passed or further work needed SPS 2.0 (RFC done) finalization work adoption vote passed or further work needed SPS EO 2.0 RFC review of received comments SWEC 2.0 (RFC done) finalize adoption vote spec passed or further work needed SOS 2.0 create RFC package RFC review of received comments O&M 2.0 (OMXML) RFC review of received comments SensorML 2.0 work towards RFC package RFC review comments adoption vote (Note: Figure based on latest information from SWG chairs, June/July 2010)
3
SWE Service Model 2.0 Current status Timeline Outstanding issues
RFC completed RFC responses not finished yet (had discussion during Silver Spring TC) Timeline finish document during summer (July / August), then SWG review start adoption vote end of August, vote would close end of October Outstanding issues identifier vs. reference discussion
4
Sensor Planning Service 2.0
Current status RFC completed need to incorporate late RFC comments Timeline finish document during summer (July / August), then SWG review start adoption vote end of August, vote would close end of October Outstanding issues identifier discussion in SWES incorporation of late comments
5
EO Satellite Tasking Extension for SPS 2.0
Current status RFC package finished. Last issue was http uri definition. The proposed http uri’s approved by OGC naming Authority (May 2010) RFC near initiation Briefed OGC Members at the closing plenary a the Silver Spring meetings Timeline RFC mid July – mid August, then review of comments adoption vote: timeframe tbd Outstanding issues consistency of operations (e.g. GetStatus, Submit)
6
SWE Common Data Model 2.0 Current status Timeline Outstanding issues
RFC completed RFC responses finished and posted to pending documents Timeline wrap up final version end of June, then SWG review start adoption vote mid / end of July, vote would close mid / end of September Outstanding issues Coordination has been done with the WCS and GML SWGs none
7
Sensor Observation Service 2.0
Current status RFC package in preparation Timeline finish RFC package until September TC, then initiate RFC RFC phase completed end of October, then review of comments adoption vote: timeframe tbd Outstanding issues identifier discussion in SWES
8
Observations and Measurements – Conceptual Model
Defines a conceptual schema for observations, and for features involved in sampling when making observations. Current Status Approved as ISO FDIS OGC Adoption Vote as OGC abstract specification topic volume initiated June 30, Completion date August 29, 2010. Issues To be resolved: Relationship of GML Observation viz O&M. No change for now. Deferred to GML 4.0.
9
Observations & Measurements 2.0 (OMXML)
Current status RFC package finished RFC near initiation Timeline RFC mid July – mid August, then review of comments adoption vote: timeframe tbd Outstanding issues To be resolved: Relationship of GML Observation viz O&M. No change for now. Deferred to GML 4.0.
10
SensorML 2.0 Current status Timeline Outstanding issues
working towards RFC package Timeline RFC planned for September (probably after TC) adoption vote: planned for December Outstanding issues Improve inheritance/configuration support Improve interface/encoding support (particularly for measurement streaming and tasking)
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.