Download presentation
Presentation is loading. Please wait.
Published byDeonte Dyson Modified over 10 years ago
1
n u c o r h i g h w a y.com Nucor Steel Marion, Inc. TL 3 System 4400 lb Pickup Truck 1800 lb Small Car Impacting at 62 mph 25 degrees
2
n u c o r h i g h w a y.com Nucor Steel Marion, Inc.
3
n u c o r h i g h w a y.com Nucor Steel Marion, Inc. 18 wheelers? NOT TESTED
4
n u c o r h i g h w a y.com Nucor Steel Marion, Inc. System Components Simple System Line Posts Cable Hook Bolts Turnbuckles End treatment
5
n u c o r h i g h w a y.com Nucor Steel Marion, Inc. Line Posts
6
n u c o r h i g h w a y.com Nucor Steel Marion, Inc. Turnbuckles Standard Cable = 1 x 750 (229m)
7
n u c o r h i g h w a y.com Nucor Steel Marion, Inc. Turnbuckles Like This! NOT like this! When turnbuckle interferes with post, leave off bolt Best practice is NOT to install all three turnbuckles in same space
8
n u c o r h i g h w a y.com Nucor Steel Marion, Inc. End Treatment 5 SPACES @ 6 - 6 = 32 - 63 SPACES @ 6 - 3 = 18 - 9 51 – 3 3 CRP posts @ 6-3 6 End Terminal Posts @ 6-6 Line posts (refer to plans)
9
n u c o r h i g h w a y.com Nucor Steel Marion, Inc. CRP Posts
10
n u c o r h i g h w a y.com Nucor Steel Marion, Inc. Delineation 3M #94 Primer 3M High Intensity Prismatic #3931 Reflective Sheeting
11
n u c o r h i g h w a y.com Nucor Steel Marion, Inc. Maintenance of System
12
n u c o r h i g h w a y.com Nucor Steel Marion, Inc. Common Impacts – SIMPLE REPAIR
13
n u c o r h i g h w a y.com Nucor Steel Marion, Inc. CRP Posts Line Post Repair
14
n u c o r h i g h w a y.com Nucor Steel Marion, Inc. Line Post Repair Make SURE: Cable on correct side Hook bolt nuts hand tightened Cable Heights TOP = 29.5 ±1 MIDDLE = 25.5 ±1 BOTTOM = 21.5 +0/-2 Check and record tension
15
n u c o r h i g h w a y.com Nucor Steel Marion, Inc. Uncommon Impacts
16
n u c o r h i g h w a y.com Nucor Steel Marion, Inc. Releasing Tension 1.Loosen turnbuckle(s) 2.Cable grip and winch – pull towards accident 3.Ratchet come-along and 2 cable grips 4.Knock over CRPs 5.LAST CASE – CUT THE CABLE
17
n u c o r h i g h w a y.com Nucor Steel Marion, Inc. Quick De-tensioning
18
n u c o r h i g h w a y.com Nucor Steel Marion, Inc. CRP Repair
19
n u c o r h i g h w a y.com Nucor Steel Marion, Inc. Re-tensioning – STANDARD CABLE Check Temperature Chart 15% higher 0 to 1.5 years After first major freeze After impact Tension tolerance is +15-20% or up to 2500 lbs. Check within first month after installation Periodically over the first year
20
n u c o r h i g h w a y.com Nucor Steel Marion, Inc. Checking Tension
21
n u c o r h i g h w a y.com Nucor Steel Marion, Inc. Additional information, photos, videos, and manuals available at nucorhighway.com U.S. High-Tension Cable System
22
n u c o r h i g h w a y.com Nucor Steel Marion, Inc. Questions ? U.S. High-Tension Cable System
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.