Project Scope Change Summary: Processing change at RMEP to close draincock P/N S923E on all L series engines Background: Customers have requested that.

Similar presentations


Presentation on theme: "Project Scope Change Summary: Processing change at RMEP to close draincock P/N S923E on all L series engines Background: Customers have requested that."— Presentation transcript:

1 Information To support CEAF Oil Cooler Draincock Closure on L series product 8/30/2016

2 Project Scope Change Summary: Processing change at RMEP to close draincock P/N S923E on all L series engines Background: Customers have requested that the coolant draincock located in the bottom of the oil cooler be shipped in the closed position Implementation Strategy and Date: Manufacturing Change Request at RMEP expected implementation 9/30/2016

3 Applicable BB Options BB 9080 BB 9081 BB 9110 BB 9248 BB 9270 BB 9293
BP 9896 BP97048 BB 9916 BB 9917 BB 9924

4 Closed Position (Proposed)
Change Summary Closed Position (Proposed) Open Position (Current)

5 Overlay of New position & Old position
Open (Current Position) - Yellow Closed (New Position) - Blue


Download ppt "Project Scope Change Summary: Processing change at RMEP to close draincock P/N S923E on all L series engines Background: Customers have requested that."