Presentation is loading. Please wait.

Presentation is loading. Please wait.

Submission Title: TG4m 4TV Closing Report for September 2012

Similar presentations


Presentation on theme: "Submission Title: TG4m 4TV Closing Report for September 2012"— Presentation transcript:

1 Submission Title: TG4m 4TV Closing Report for September 2012
April 19 September 2012 Project: IEEE P Working Group for Wireless Personal Area Networks(WPANs) Submission Title: TG4m 4TV Closing Report for September 2012 Date Submitted: 20 September 2012 Source: Sangsung. Choi(ETRI) Contact: Sangsung. Choi(ETRI) Voice: , Re: TG4m Closing Report for September 2012 Interim Meeting Abstract: Closing Report for TG4m Session in Palm Springs Purpose: TV White Space Amendment to IEEE Notice: This document has been prepared to assist the IEEE P It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P Slide 1 Sangsung Choi(ETRI)

2 September 2012 Meeting Goal This Week Hear merged proposal presentations for baseline documents(FSK, OFDM,NB-OFDM, MAC, Ranging) Adopt baseline documents Hear presentations if any Discussion on future efforts and next steps Sangsung Choi(ETRI)

3 doc.: IEEE 802.15-<15-09-0758-00-004e>
<month year> <month year> doc.: IEEE <doc#> September 2012 Meeting Slots Mtg Monday Tuesday Wednesday Thursday AM1 Hear Presentation if any Discuss next step AM2 Opening Logistics Hear Presentation PM1 Hear merged FSK-PHY proposal Hear merged NB OFDM- PHY proposal Further Discussion Merged Proposals PM2 Hear merged OFDM-PHY proposal Hear merged presentations: MAC Discuss Baseline Adaptation Discuss Proposal Draft Preparation Sangsung Choi(ETRI) Page 3 <author>, <company>

4 Presenter (Affiliation) Presenter (Affiliation)
4/10/2019 September 2012 TG4m Closing Report(1) Heard 5 presentations for merged proposals - FSK-PHY, OFDM-PHY, NB OFDM-PHY, MAC, RANGING No DoC # Title Presenter (Affiliation) 1 m tvws-fsk-merged-proposal-draft Cristina Seibert(SSN) 2 m ofdm-phy-merged-proposal-for-tg4m Soo-Young Chang(SYCA) 3 m tvws-nb-ofdm-merged-proposal-to-tg4m Hiroshi Harada(NICT) 4 m merged-mac-proposal-summary Benjamin A. Rolfe(BCA) 5 m suggested-baseline-for-optional-tg4m-ranging Mi-Kyung Oh(ETRI) Heard 2 presentations for contribution No DoC # Title Presenter (Affiliation) 1 m State of TVWS George Flammer(SSN) 2 m UC Proposal Kuor-Hsin Chang(Elster) Sangsung Choi(ETRI)

5 TG4m Closing Report(2) Motion for approving the baseline documents
4/10/2019 September 2012 TG4m Closing Report(2) Motion for approving the baseline documents FSK PHY Merged Proposal document: m-tvws-fsk-merged-proposal-draft  OFDM PHY Merged Proposal documents: m-task-group-15-4m-ofdm-merged-text-proposal m-ofdm-phy-merged-proposal-for-tg4m  Narrowband OFDM PHY Merged Proposal document: m-tvws-nb-ofdm-merged-proposal-to-tg4m  MAC Merged Proposal documents: m-tg4m-merged-mac-proposal m-merged-mac-proposal-summary  Ranging Proposal document: m-suggested-baseline-for-optional-tg4m-ranging  as the baseline for TG4m and authorize the editors to prepare a proposed draft for letter ballot from these documents. Moved by Clint Powell, Seconded by Sum Chin Sean Yes: 18, No: 4, Abstain: 2 18/4/2 - Motion Carries (81.8%) Sangsung Choi(ETRI)

6 TG4m Closing Report(3) Discussed future efforts and next steps
4/10/2019 September 2012 TG4m Closing Report(3) Discussed future efforts and next steps - Editors will take the baseline documents and present it the during the November meeting. - The draft document should be provided on Sunday prior to the November meeting week Meeting was adjourned early - Motion to adjourn the meeting Moved by: Ben Rolfe, Seconded by: Hiroshi Harada Motion was carried by unanimous consent Sangsung Choi(ETRI)

7 doc.: IEEE 802.15-<15-09-0758-00-004e>
<month year> September 2012 Future Plan/Timeline Form a New Task Group - Affirm new officers for TG4m September 2011 - Prepare the TGD November, 2011, January Finalizing the TGD & Call for Proposal March 2012 Proposal Effort - Preliminary Proposals & Presentations May - Final Proposals July 9, 2012 - Proposal Presentations July , 2012 - Merge Proposals September 2012 - Adopt Baseline September 2012 Slide 7 Sangsung Choi(ETRI) 7

8 Future Plan/Timeline(2)
doc.: IEEE < e> <month year> September 2012 Future Plan/Timeline(2) Drafting - Preliminary draft November 2012 - Final draft (ready for WG Letter Ballot) January 2013 Balloting - Letter ballot March 2013 - Recirculation May, July, September, 2013 - Sponsor ballot November 2013 - Recirculation January, March 2014 Slide 8 Sangsung Choi(ETRI) 8


Download ppt "Submission Title: TG4m 4TV Closing Report for September 2012"

Similar presentations


Ads by Google