NDIA PMSC Baseline Stability Working Group

Similar presentations


Presentation on theme: "NDIA PMSC Baseline Stability Working Group"— Presentation transcript:

1 NDIA PMSC Baseline Stability Working Group
August 2009 Neil Albert Pete Wynne

2 Baseline Stability Gerald Self - ITT Marty Doucethe – EVM Services
Sondra Ewing – Lockheed Martin Tom Tasker – General Atomics Fran Fulton – Northrop Grumman Neil Albert - MCR Pete Wynne – Lockheed Martin Joe Houser – KM Systems Linda Nobel – Raytheon Mary Ann Hale – General Dynamics Walt Berkey – Lockheed Martin Gary Robinson - Raytheon Ed Silvia - Raytheon Steve Stroud – General Dynamics Kim Herrington – Bell Helicopter Marcy Bartlett – Lockheed Martin Ken Anderson – Lockheed Martin Steve Hickman – Rolls Royce Oren Ben-Zeev – P&W Sung Soon Stultz – Rockwell Collins Rob Edwards – P2 Corp

3 Objective Goals Baseline Stability
Adapt Program Performance Management to efficiently Integrate with the Acquisition Process given that change is inevitable. Goals Integrate Existing Performance Management With Existing Acquisition Processes Eliminate Waste and Reduce Re-Work in maintaining an integrated performance measurement baseline Streamline the Program Performance and Acquisition interfaces Minimize Deconstruction

4 Baseline Stability Definition
The stability of the Cost, Schedule, and Technical Baseline is demonstrated through the establishment of process definition, strong internal controls, and disciplined competency. The planning, statusing, and execution of the Baseline is accomplished within the confines of the EVMS work products using an adaptable approach. NEW Approach 4 4

5 Attributes of Baseline Instability
High Risk Ill-defined requirements and volitility Unstable funding Ongoing changes to the contract Milestones not clearly defined Yet to be proven or immature technologies Poorly defined resources to execute the plan Schedule flux Inexperienced customer Contract inappropriate Mission/User need change Others Work In Progress DRAFT

6 Next Steps Need to determine how we adapt EVM to the changing environment of acquisition Adaptable Agile Risk focused Scale to the needed level of detail and be responsive Others Establish a common understanding of today’s environment Work with customers to ensure we understand their position Come back with a coordinated view Create a plan as to how we meet changing activities Deliver a proposed process to PMSC