Presentation is loading. Please wait.

Presentation is loading. Please wait.

Liaison Report Date: Authors: July 2009

Similar presentations


Presentation on theme: "Liaison Report Date: Authors: July 2009"— Presentation transcript:

1 802.15 Liaison Report Date: 2009-07-17 Authors: July 2009
June 2009January 2009September 2008 January 2009September 2008 September 2008 doc.: IEEE /xxxxr0 July 2009 Liaison Report Date: Authors: Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics

2 Abstract Liaison report on 802.15 as presented to 802.11 July 2009
September 2008 January 2009September 2008 June 2009January 2009September 2008 doc.: IEEE /xxxxr0 July 2009 Abstract Liaison report on as presented to Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics

3 September 2008 May 2008 June 2009January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 July 2009 c 60GHz Alternate PHY Second Recirculation Sponsor Ballot on Draft 12.0 closed on July 7, Results: 161/7/ % 9 comments received Resolved all the comments. Draft 13.0 was put out for recirculation July 15-25 Will ask for conditional EC approval to publish Friday Slide 3 Slide 3 Clint Chaplin, Samsung Electronics Page 3 Page 3 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

4 802.15.4 Working on a rollup of 802.15.4 and approved amendments.
September 2008 May 2008 June 2009January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 July 2009 Working on a rollup of and approved amendments. Planning on submitting to ISO/IEC under the PDSO Slide 4 Slide 4 Clint Chaplin, Samsung Electronics Page 4 Page 4 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

5 802.15.4e MAC amendments Finalizing input for the first draft
September 2008 May 2008 June 2009January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 July 2009 e MAC amendments Finalizing input for the first draft Scheduled for first WG ballot in coming out of the November 2009 meeting Slide 5 Slide 5 Clint Chaplin, Samsung Electronics Page 5 Page 5 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

6 September 2008 May 2008 June 2009January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 July 2009 f RFID Received three preliminary PHY proposals as a result of the call for proposals Final PHY proposals due at the September meeting Vote on PHY proposals in November Slide 6 Slide 6 Clint Chaplin, Samsung Electronics Page 6 Page 6 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

7 802.15.4g Smart Utility Networks
September 2008 May 2008 June 2009January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 July 2009 g Smart Utility Networks Heard final proposals and merged proposals Continued to discuss proposals Planning on a draft for WG ballot coming out of the November 2009 meeting Slide 7 Slide 7 Clint Chaplin, Samsung Electronics Page 7 Page 7 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

8 July 2009 July 2009 WBAN Status A presentation was given by Dr. Darrell William, MD – professor at Stanford University on body area networks and for diabetes patients – doc: TG6 is in the process of sorting through proposals and encouraging mergers PHY proposals include: Narrowband, UWB – IR, UWB –FM, Pulse Chirp UWB, Narrow band (FSK, GMSK, PSK) Frequency bands of interest: 400, 600, 868, 900, 950, 2,400, and MHz Slide 8

9 802.15.6 WBAN Status cont…. Achieve 3 merged proposals
June 2009January 2009September 2008 July 2009 July 2009 WBAN Status cont…. Achieve 3 merged proposals Hosted 8 technical presentations Expecting more merged proposals in September FCC NPRM in place for comment – MHz band for Medical BANs 1 MHz BW, EIRP 1mW NPRM letter approved by Vote: 7/0/2 ETSI eHealth held meeting in May 09 Also considering MHz and 2500 MHz bands Next meeting in September 2009 Slide 9

10 802.15.7 Visible Light Communication
September 2008 May 2008 June 2009January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 July 2009 Visible Light Communication Finished the Technical Considerations Document Group will be hearing draft contributions in September Slide 10 Slide 10 Clint Chaplin, Samsung Electronics Page 10 Page 10 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

11 References This document All Documents
September 2008 May 2008 June 2009January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 July 2009 References This document All Documents Current draft is in the members-only area  Members_Only_Area members log in using username and password Slide 11 Clint Chaplin, Samsung Electronics Page 11 Clint Chaplin, Samsung Clint Chaplin, Samsung Electronics


Download ppt "Liaison Report Date: Authors: July 2009"

Similar presentations


Ads by Google