AOA A style of project network diagram in which arrows

Similar presentations


Presentation on theme: "AOA A style of project network diagram in which arrows"— Presentation transcript:

1 AOA A style of project network diagram in which arrows
AOA or AON or Gantt chart? AOA A style of project network diagram in which arrows represent tasks and their connections with nodes represent precedence relationships. Page 192 Click here for Hint

2 AON A style of project network diagram in which nodes
AOA or AON or Gantt chart? AON A style of project network diagram in which nodes represent tasks and the connecting pathways represent precedence relationships. Page 192 Click here for Hint

3 backward scheduling or CPM or
forward scheduling? backward scheduling Scheduling backward from a project’s deadline to its start time. Page 205 Click here for Hint

4 Central Limit Theorem The observation that sample values approximate
standard normal distribution or PERT or Central Limit Theorem? Central Limit Theorem The observation that sample values approximate a normal distribution, regardless of the underlying distribution of the population being sampled. Page 212 Click here for Hint

5 CPM Critical Path Method, a project management
PERT or CPM or WBS? CPM Critical Path Method, a project management methodology developed by DuPont Corporation. Page 191 Click here for Hint

6 path or precedence relationship or crashing?
Expediting the completion of a task or group of tasks, to finish a project sooner. Page 206 Click here for Hint

7 critical path The longest path through a project network;
critical path or milestone or expected value? critical path The longest path through a project network; determines the length of the entire project. Page 201 Click here for Hint

8 deterministic Fixed and known in advance, representing a
critical path or deterministic or expected value? deterministic Fixed and known in advance, representing a high level of certainty when planning. Page 192 Click here for Hint

9 expected value The mathematical expectation of a random
expected value or probabilistic or Central Limit Theorem? expected value The mathematical expectation of a random variable, calculated as the weighted average of all possible values that may occur. Page 210 Click here for Hint

10 forward scheduling or backward scheduling
or critical path? forward scheduling Starting an activity as soon as possible, regardless of its deadline. Page 204 Click here for Hint

11 path or precedence relationship or
Gantt chart? Gantt chart A scheduling diagram that illustrates activities across a horizontal time line. Page 204 Click here for Hint

12 precedence relationship?
immediate predecessor or milestone or precedence relationship? immediate predecessor A task that must be completed before another task can start. Page 190 Click here for Hint

13 crashing or incident or AON?
A project with no previously planned timing and a high degree of dependence on its immediate environment for successful resolution. Page 191 Click here for Hint

14 iterative planning Adjusting plans at short intervals, to reflect
backward scheduling or PERT or iterative planning? iterative planning Adjusting plans at short intervals, to reflect emerging information. Page 191 Click here for Hint

15 milestone A point of significance in the time line of a project.
milestone or slack or incident? milestone A point of significance in the time line of a project. Page 190 Click here for Hint

16 path Any sequence of linked
PERT or precedence relationship or path? path Any sequence of linked activities that connect the beginning with the end of a project network. Page 195 Click here for Hint

17 PERT Program Evaluation and
CPM or PERT or WBS? PERT Program Evaluation and Review Technique, a project management methodology developed by the US Navy. Page 191 Click here for Hint

18 precedence relationship
PERT or precedence relationship or path? precedence relationship A dependency between two tasks, usually requiring that one task be completed before the other task is started. Page 193 Click here for Hint

19 probabilistic Variable or not well
standard normal distribution or incident or probabilistic? probabilistic Variable or not well known in advance; subject to randomness. This represents uncertainty in planning. Page 209 Click here for Hint

20 project A unique collection of activities creating a
project or path or PERT? project A unique collection of activities creating a particular outcome. Page 190 Click here for Hint

21 slack or incident or crashing?
The degree to which a task may be delayed from its early start without delaying the project. Page 202 Click here for Hint

22 probabilistic or deterministic?
standard normal distribution or probabilistic or deterministic? standard normal distribution A normal distribution with a mean of zero and a variance of 1. Page 214 Click here for Hint

23 AON or AOA or WBS? WBS Work Breakdown Structure, a document specifying the tasks required to finish a project. Page 190 Click here for Hint


Download ppt "AOA A style of project network diagram in which arrows"