MONTENEGRO HILTON HOTEL CD inženjering
2
Hilton Hotel, Podgorica
Project Details Building Type Hotel Building Size m² Project Dates December 2011 – October 2016 Saint-Gobain Products & Systems Rigips partitons Rigips ceilings Fire resistant systems Aquaroc cement boards
3
Hilton Hotel, Podgorica
Contractor Company Name CD inženjering Main Representative Mr. Dragan Kovačević Company Size 14 Specialised in Drylining
4
Hilton Hotel, Podgorica
Building Owner Architect Contractor Interior Designer Saint-Gobain Project Manager Normal Tours AD UTIP Montenegro Mladen Krekić, Business Art Milano CD inženjering Kate Martin, Rethink Interiors Ltd. London Vidan Mitrović
5
Hilton Hotel, Podgorica
This project included reconstruction and extension of the hotel Crna Gora, the hotel with the longest tradition in Montenegro, located in the center of Podgorica, capital od Montenegro. Newly accommodation facility got the franchise of world famous hotel chain - Hilton. This five star luxury hotel contains: 180 double-bedrooms, 23 suites, congress center, restaurant, bar, SPA center, indoor swimming pool and underground garage. In addition to hotel capacity, this project contains shopping mall and business center. Sample text (high level project pitch) STRANDBADKIRCHBICHL is a visionary design project involving the construction of a new office building in a remote mountain region of Austria, with a design which reflected the crashing waves coming in from the nearby beach. Great technical skill and knowledge of interior systems was required in order to optimize lighting, acoustics and sound absorption within a very complex curved shaped structure which would not naturally provide this level of performance. This presentation will also be used on the book and on the website to present your project.
6
Hilton Hotel, Podgorica
7
Hilton Hotel, Podgorica
The new Hilton Podgorica Montenegro is conveniently situated in the city centre and close to all public and commercial facilities, making it the perfect option for both business and leisure guests. 180 rooms and 23 suites 4 restaurants and lounges Spa, beauty salon, indoor pool, steam room, Finnish and bio sauna Executive Lounge 727 m² of event space, including Crystal Ballroom for 435 guests theatre-style
8
Hilton Hotel, Podgorica
Exterior celings of attractive terrace space by the fountains in the ground floor was done with Aquaroc cement boards.
9
Hilton Hotel, Podgorica
The most challenging was ceiling in SPA area where small perforations had to be created for lighting to create „sky“ effect above the swimming pool.
10
Hilton Hotel, Podgorica
11
Hilton Hotel, Podgorica
Various kinds of decorative ceiling was done in conference rooms specially designed for different programs, from presentations and parties up to team building and other business meetings. Rigips suspended ceiling was combined with very attractive decorative elements.
12
Hilton Hotel, Podgorica
Key challenges Solving a great number of applications of technical untypical design details Reconstruction and udgrade of an old building Creating „sky“ effect with inserting lighting in special made small perforations on Aquaroc boards Sample text Acoustics and light are the dominating elements in this project. The challenge was to allow maximal use of natural daylight using an unusually large funnel and integrating artificial lighting to complement natural light. The design however also had to provide an excellent level of acoustic performance in a challenging large open plan structure with high windowed ceilings. In addition to a combination of acoustics, sound absorption and light, there was particular emphasis on architecture and functionality through to the final finishing coating (Q4 surface quality) in order to meet the rigorous project standards.
13
Hilton Hotel, Podgorica
Main Saint-Gobain products and systems used Drylining systems All areas Sound insulation - Rigips partitions with Isover wool Conference rooms Moisture resistance – Aquaroc cement boards SPA area Outdoor terrace area Key achievements?
14
Hilton Hotel, Podgorica
Key achievements Solving technical problems and giving unique solutions like special spherical constructions Achieved high level of aesthetic details Drylining systems has saved money and more important saved time in order to finish the project on time Successfully finished project thanks to the excellent cooperation of the Rigips team, investors and contractors Top quality of works according to highest international standards Good reference for Aquaroc boards Sample text Project delivered to challenging budget and time schedule Discussion throughout the process with the architect to optimize each design phase. Final result combines high standards for design / aesthetics, acoustic comfort, and optimal levels of natural daylight.
15
HILTON HOTEL MONTENEGRO CD inženjering – Mladen Krekić
SGCP Marija Arsić Photography Credits: Normal Tours