The European approach to the fusion-like neutron source: The IFMIF-DONES Project FEC 2018, Gandhinagar (India), October 22-27th 2018 A. Ibarra and The WPENS team
2
The WPENS Team F. Arbeiter, D. Bernardi, A. García, W. Krolas, M. Capelli, U. Fischer, R. Heidinger, D. Jiménez, F. Martin-Fuerte, G. Micciché, A. Muñoz, F. S. Nitti, T. Pinna, K. Tian + Many other people from different institutions and companies A. Ibarra et al| The IFMIF-DONES project| IFEC 2018, Gandhinagar| October 22-27, 2018| Page 2
3
Outline The IFMIF-DONES project IFMIF-DONES description Summary
A. Ibarra et al| The IFMIF-DONES project| IFEC 2018, Gandhinagar| October 22-27, 2018| Page 3
4
Outline The IFMIF-DONES project IFMIF-DONES description Summary
A. Ibarra et al| The IFMIF-DONES project| IFEC 2018, Gandhinagar| October 22-27, 2018| Page 4
5
Neutron source requirements
Along the time, it has been widely recognized that a fusion-like neutron source is needed for fusion materials qualification both for DEMO and the power plant development The requirements are to produce fusion-like neutrons Intensity large enough to allow accelerated testing, Damage level above the expected operational lifetime, Irradiation volume large enough to allow the characterization of the macroscopic properties of the materials of interest required for the engineering design The most feasible approach based on Li(d,xn) sources The IFMIF project since 90´s A. Ibarra et al| The IFMIF-DONES project| IFEC 2018, Gandhinagar| October 22-27, 2018| Page 5
6
Neutron source requirements
Along the time, it has been widely recognized that a fusion-like neutron source is needed for fusion materials qualification both for DEMO and the power plant development Requirements based on EU DEMO needs The requirements are to produce fusion-like neutrons Intensity large enough to allow accelerated testing, Damage level above the expected operational lifetime, Irradiation volume large enough to allow the characterization of the macroscopic properties of the materials of interest required for the engineering design > 10 dpa(Fe)/fpy 20 dpa(Fe) in 1.5 y 50 dpa(Fe) in 3.5 y 300 cm3 The most feasible approach based on Li(d,xn) sources The IFMIF-DONES project!!! The IFMIF project since 90´s A. Ibarra et al| The IFMIF-DONES project| IFEC 2018, Gandhinagar| October 22-27, 2018| Page 6
7
What is IFMIF-DONES? IFMIF-DONES (Demo-Oriented Neutron Source)
It is the minimum neutron source required to fulfill the materials fusion-like irradiations needs of DEMO IFMIF-DONES (Demo-Oriented Neutron Source) Main technical characteristics: Based on IFMIF Preliminary Engineering Design simplified as much as possible Objective of the work presently under development: to be ready for start of the construction phase in the early 20´s Still no formal decision is made!!! A. Ibarra et al| The IFMIF-DONES project| IFEC 2018, Gandhinagar| October 22-27, 2018| Page 7
8
IFMIF-DONES Timeline Project timeline
IFMIF-EVEDA validation activities: Orai loop, Heloka, Lifus6, LIPAc IFMIF-DONES validation activities Critical technical issues analysis (quench tank location, TA approach, AC configuration,… IFMIF EDR 2013 Project timeline IFMIF-DONES Conceptual Design Report 2014 A. Ibarra et al| The IFMIF-DONES project| IFEC 2018, Gandhinagar| October 22-27, 2018| Page 8
9
IFMIF-DONES Timeline Project timeline
IFMIF-EVEDA validation activities: Orai loop, Heloka, Lifus6, LIPAc IFMIF-DONES validation activities Critical technical issues analysis (quench tank location, TA approach, AC configuration,… IFMIF EDR 2013 Project timeline Plant and systems requirements definition Design guidelines Boundaries and interfaces identification Implementation of design choices Systems design Integrated analysis IFMIF-DONES Conceptual Design Report 2014 Reference Design Second half 2016 A. Ibarra et al| The IFMIF-DONES project| IFEC 2018, Gandhinagar| October 22-27, 2018| Page 9
10
IFMIF-DONES Timeline Project timeline
IFMIF-EVEDA validation activities: Orai loop, Heloka, Lifus6, LIPAc IFMIF-DONES validation activities Critical technical issues analysis (quench tank location, TA approach, AC configuration,… IFMIF EDR 2013 Project timeline Plant and systems requirements definition Design guidelines Boundaries and interfaces identification Implementation of design choices Systems design Integrated analysis IFMIF-DONES Conceptual Design Report 2014 Reference Design Second half 2016 Preliminary Engineering Design report end 2017 A. Ibarra et al| The IFMIF-DONES project| IFEC 2018, Gandhinagar| October 22-27, 2018| Page 10
11
PEDR content Executive Summary
Plant Design Description Document (PDD): Main body + Annexes (incl. Desing Guidelines, PBS and Interfaces, RAMI, Safety, Operation and Maintenance, Integrated Modelling, 3D CAD,…) Design Description Documents (DDDs) (one per system) A. Ibarra et al| The IFMIF-DONES project| IFEC 2018, Gandhinagar| October 22-27, 2018| Page 11
12
IFMIF-DONES Timeline Project timeline
IFMIF-EVEDA validation activities: Orai loop, Heloka, Lifus6, LIPAc IFMIF-DONES validation activities Critical technical issues analysis (quench tank location, TA approach, AC configuration,… IFMIF EDR 2013 Project timeline Plant and systems requirements definition Design guidelines Boundaries and interfaces identification Implementation of design choices Systems design Integrated analysis EU site proposal: Granada (Spain) End 2017 IFMIF-DONES Conceptual Design Report 2014 Reference Design Second half 2016 Preliminary Engineering Design report end 2017 A. Ibarra et al| The IFMIF-DONES project| IFEC 2018, Gandhinagar| October 22-27, 2018| Page 12
13
DONES EU Site Location It is located in the Granada province (Andalusia region – southern Spain), 18 km southwest from Granada city in the Granada Metropolitan park (Escúzar ). A. Ibarra et al| The IFMIF-DONES project| IFEC 2018, Gandhinagar| October 22-27, 2018| Page 13
14
IFMIF-DONES Timeline Project timeline
IFMIF-EVEDA validation activities: Orai loop, Heloka, Lifus6, LIPAc IFMIF-DONES validation activities Critical technical issues analysis (quench tank location, TA approach, AC configuration,… IFMIF EDR 2013 Project timeline Plant and systems requirements definition Design guidelines Boundaries and interfaces identification Implementation of design choices Systems design Integrated analysis EU site proposal: Granada (Spain) End 2017 IFMIF-DONES Conceptual Design Report 2014 Reference Design Second half 2016 Preliminary Engineering Design report end 2017 DONES in EU ESFRI Roadmap 2018 A. Ibarra et al| The IFMIF-DONES project| IFEC 2018, Gandhinagar| October 22-27, 2018| Page 14
15
Outline The IFMIF-DONES project IFMIF-DONES description Summary
A. Ibarra et al| The IFMIF-DONES project| IFEC 2018, Gandhinagar| October 22-27, 2018| Page 15
16
Accelerator systems summary
SRF cryomodule RFQ 175 MHz, 5MW, 125 mA, CW, high availability: One of the more powerful accelerators in the world. Waiting for validation results from LIPAc (Rokkasho) Very similar to the IFMIF one but some changes implemented…. A. Ibarra et al| The IFMIF-DONES project| IFEC 2018, Gandhinagar| October 22-27, 2018| Page 16
17
Test Systems summary Irradiation module
Cooled shielding plug Design driven by the presence of neutrons and Li Internal components cooling by He Remote Maintenance required HFTM: it is feasible different temperatures of irradiation with active controlled temperature stability Similar to the IFMIF one but some changes implemented (or to be implemented)… Duct penetration A. Ibarra et al| The IFMIF-DONES project| IFEC 2018, Gandhinagar| October 22-27, 2018| Page 17
18
Li systems summary Target assembly Oil-Oil secondary HX
Support structure Lithium inlet pipe Inlet nozzle Back-Plate FDS Outlet nozzle Target chamber Beam duct Quench Tank Lithium outlet pipe IISP Inlet pipe fixed point TC floor level Oil-Oil secondary HX Li-Oil primary HX LI main loop Target assembly Oil-Water tertiary HX Li monitoring Li purification loop A. Ibarra et al| The IFMIF-DONES project| IFEC 2018, Gandhinagar| October 22-27, 2018| Page 18
19
Li systems summary Support structure Lithium inlet pipe Inlet nozzle Back-Plate FDS Outlet nozzle Target chamber Beam duct Quench Tank Lithium outlet pipe IISP Inlet pipe fixed point TC floor level Oil-Oil secondary HX 5 MW power handling, 15 m/s Li velocity, remote handling Main requirements: Li flow stability and Li impurities control Main challenges to be considered: Target Assembly lifetime Risk of cavitation, Li evaporation T (and other radioactive ions) inventory Very relevant results from IFMIF/EVEDA validation activities Very similar to the IFMIF one but some changes implemented… Li-Oil primary HX LI main loop Target assembly Oil-Water tertiary HX Li monitoring Li purification loop A. Ibarra et al| The IFMIF-DONES project| IFEC 2018, Gandhinagar| October 22-27, 2018| Page 19
20
Remote Handling System
Key and complex system It requires evaluation of maintenance needs and dose maps, identification of all the required operations, design of common and specific tools, evaluation of the operations,… A. Ibarra et al| The IFMIF-DONES project| IFEC 2018, Gandhinagar| October 22-27, 2018| Page 20
21
Outline The IFMIF-DONES project IFMIF-DONES description Summary
A. Ibarra et al| The IFMIF-DONES project| IFEC 2018, Gandhinagar| October 22-27, 2018| Page 21
22
Available Irradiation Volume vs DPA
IFMIF 20x5 cm2 beam IFMIF-DONES 10x5 cm2 beam IFMIF-DONES 20x5 cm2 beam A. Ibarra et al| The IFMIF-DONES project| IFEC 2018, Gandhinagar| October 22-27, 2018| Page 22
23
Summary A fusion-like neutron source is needed as soon as possible for DEMO design and IFMIF-DONES is the proposed European alternative to be implemented in the near future IFMIF-DONES design is based on IFMIF design evolved to take into account a reduced scope and results obtained during the prototyping phase Preliminary Engineering Design Report were released early Present design activities are site specific (Granada-Spain-) A “Start of construction” decision should be taken as soon as possible A. Ibarra et al| The IFMIF-DONES project| IFEC 2018, Gandhinagar| October 22-27, 2018| Page 23
24