Presentation is loading. Please wait.

Presentation is loading. Please wait.

Voyage into Validation

Similar presentations


Presentation on theme: "Voyage into Validation"— Presentation transcript:

1 Voyage into Validation
Launch into Validation with Confidence Claudia Harrier The Vancouver Clinic Vancouver, Washington

2 1. Have a Plan 2. Benefits of Templates 3. Pre-Validation
Voyage Overview 1. Have a Plan 2. Benefits of Templates 3. Pre-Validation 4. Validation 5. Post-Validation 6. Validation Summary

3 Voyage into Validation
HAVE A PLAN

4 Have a Plan Understand the Validation Project Major Upgrade for SCC or HIS/EMR Minor Upgrade(Hot Fix)--SCC or HIS Change of Reference Lab New Tests New Instruments New Sites

5 Have a Plan What is changing? Check Release Notes
Check Related Star Tasks What systems are involved? EMR HIS Reference Lab Billing System

6 Have a Plan Identify Resources and Staffing
Determine Time Requirements Dedicate Time for Validation Identify “Show-Stoppers” Set a Tentative Go-Live Date

7 Voyage into Validation
BENEFITS OF TEMPLATES

8 Benefits of Templates Identifies important validation points/steps
Is ready when you are Can be easily amended Makes you look organized

9 Voyage into Validation
PRE-VALIDATION

10 Pre-Validation Assessment
Assures access to applications Assures that basic functionality has not been compromised Assures interface messages are flowing as anticipated

11 Pre-Validation Assessment Form
Pre-Assessment Functionality Check Software/Version:________________ Date Test Epic Order # Ordered in Epic SCC Order # Results in Epic Initials CBC RA with Reflex TSH-Referred Comments: The above Upgrade/Change has passed pre-assesment functionality check. Validation testing may commence. Date _____________________ Approved by:________________________

12 Voyage into Validation

13 Choose tests that validate:
Validation Choose tests that validate: All departments All sites Instrument-interfaced tests Manually resulted tests In-house tests Group/Individual tests Reference Lab tests Tests that reflex Amended tests Tests with panic levels Variety of microbiology tests

14 Functions to Validate Order entry Faxing Call List Keypads RBS
Label Formats Report Formats Query Print Scheduler Autoreporting Scanners Reports Faxing Keypads Security QC Worklists Audit Trail Canned Messages Calculations Multi-site/Redirection

15 Validation Form SCC Test ID Epic ID Test Name Scenario Epic # Name
Integrated SCC Test ID Epic ID Test Name Scenario Epic # Name Order Date SCC SoftPath VP # Tech completed Professional Completed Results in Epic? Expected Cpts to charge CPTs charged in Epic Validate Date Validate Initials 1 2430 % IRON SATURATION PANEL 2 * 2505 17 OH CORTICOSTEROIDS, 24 H URINE-REF Commercial Ins

16 Voyage into Validation
POST-VALIDATION

17 Post-Validation Finalize Go-Live date Inform all invested parties: SCC
Lab Departments Reference Lab HIS Staff Hospital Staff Outreach Clients

18 Post-Validation (Post- Go Live) Form
Post-Live Functionality Check Software/Version:______________________________ Date EPIC ID In-House Tests Performed at Epic Order # SCC Order # Results in Epic Initials LAB293 CBC-manual result-high & low values-Smear Review MHEMA CBC-run on analyzer LAB239 URC-run on analyzer MMICR LAB9980 PTINR-manual result MCOAG

19 Voyage into Validation
VALIDATION SUMMARY

20 Post-Validation Summary
Purpose A record of dates A record of issues for future reference Overview Keep notes throughout validation Write summary of process Date & sign

21 SUMMAry exAMPLE SOFTPATH UPGRADE (Including ASCII Base , HIS , INST , COMMONS , & SOFT REPORTS ) The Vancouver Clinic SoftPath Upgrade was installed in SCC UPG environment on The version in LIVE was At the same time the following were also installed in SCC UPG: PRODUCT                    LIVE                 UPG AIX                                                    ASCII BASE                           HIS                                         INST                                       COMMONS                           PATH                                       SOFTREPORTS                     The following were unchanged in the upgrade project: PRODUCT                    LIVE                 UPG LAB                                        ORACLE                                 Release notes were reviewed for applicable functionality and changes. Pre-validation testing was completed on The testing of the validation scenarios began on and was completed on A hot fix for the assigning of specimen source was installed and validated. Other problems encountered were fixed or were suspended to future releases. The LIVE SoftPath back-up was completed by The Vancouver Clinic’s IT department at 12:15 am SCC began the install of the upgrade into LIVE at 03: and completed at 06:29. The testing of SoftPath and SoftLab was completed by SCC technical specialists at 6:44 am. A tissue was ordered on a Test Patient to test functionality in LIVE environment. Validation of SoftLab functionality and interface check in LIVE environment was completed at TVC at 7:02 am. The applicable TMS items were updated. Claudia Harrier MLT(ASCP)QLI Software Analyst, LIS

22 I am pleased to attempt to answer your questions.
During the question time, you may download template examples to your jump drive.

23 Thank you for joining me on the Voyage into Validation!
Thanks a Bundle! Thank you for joining me on the Voyage into Validation!


Download ppt "Voyage into Validation"

Similar presentations


Ads by Google