Presentation is loading. Please wait.

Presentation is loading. Please wait.

TGn Closing Report Los Angeles, CA, US 802 Interim

Similar presentations


Presentation on theme: "TGn Closing Report Los Angeles, CA, US 802 Interim"— Presentation transcript:

1 TGn Closing Report Los Angeles, CA, US 802 Interim
January 2009 doc.: IEEE /0107r0 January 2009 TGn Closing Report Los Angeles, CA, US 802 Interim Date: Authors: Name Company Address Phone 5488 Marvell Lane, Santa Clara, CA, 95054 +1 (321) Bruce Kraemer Marvell marvell .com Sheung Li SiBEAM 555 Mathilda Ave, Sunnyvale, CA 94085 +1 (408) Adrian Stephens Intel Corporation 15 JJ Thompson +1 (503) intel.com Avenue, Cambridge, CB3 0FD, UK Bruce Kraemer, Marvell Bruce Kraemer, Marvell

2 November 2008 doc.: IEEE /1252r1 November 2008 TGn Draft 7.0 Passed recirculation ballot LB138 on an unchanged draft with 95.25% affirmative This met the requirements for the conditional approval by EC for sponsor ballot Bruce Kraemer, Marvell Bruce Kraemer, Marvell

3 Sponsor ballot comment resolutions will continue past this meeting.
November 2008 doc.: IEEE /1252r1 November 2008 Sponsor Ballot 1 on TGn Passed sponsor ballot with a 77.8% affirmative vote (158 approve, 45 not approve, 17 abstain) Sponsor ballot comment resolutions will continue past this meeting. Bruce Kraemer, Marvell Bruce Kraemer, Marvell

4 TGn - Primary January Meeting Documents
doc.: IEEE /0107r0 January 2009 TGn - Primary January Meeting Documents LB138 comments r1 Conditional Approval Report r0 SB comments r0 SB comments attachments r0 TGn January Meeting Report r5 TGn Editors Report r0 TGn Closing Report r0 TGn Meeting Minutes r0 TGn Draft 7.02 Bruce Kraemer, Marvell Bruce Kraemer, Marvell

5 P802.11n SB CRC - Teleconference Plan – Accepted
January 2009 doc.: IEEE /0107r0 January 2009 P802.11n SB CRC - Teleconference Plan – Accepted Call time: 11:00 – 13:00 ET Call number: Wednesday Blocking events Topic group Meeting chair Bridge # Passcode Jan 21 Interim Jan 28 GEN MAC Bruce Kraemer 2 Feb 04 COEX Feb 11 PHY,COEX,+++ Feb 18 Ballot? ? Feb 25 Mar 04 PREP? Mar 11 Plenary Bruce Kraemer, Marvell Bruce Kraemer, Marvell

6 TGn Timeline is Unchanged
January 2009 doc.: IEEE /0107r0 November 2008 TGn Timeline is Unchanged Event Name Accepted Dates Actual Previously Approved Currently Published PAR Approved Sep ‘03 Initial WG Letter Ballot Mar ‘06 Recirculation WG Letter Ballot Oct ‘07 Form Sponsor Ballot Pool Jul ‘08 Initial Sponsor Ballot Dec ‘08 Nov ‘08 Jan ‘09 Recirculation Sponsor Ballot May ‘09 Final WG Approval Jul ‘09 Nov ‘09 Final EC Approval RevCom/ Stds Board Approval Sep ‘09 Jan ‘10 Publication Mar ‘10 Bruce Kraemer, Marvell Bruce Kraemer, Marvell


Download ppt "TGn Closing Report Los Angeles, CA, US 802 Interim"

Similar presentations


Ads by Google