Presentation is loading. Please wait.

Presentation is loading. Please wait.

<month year> doc.: IEEE < e> <July 2018>

Similar presentations


Presentation on theme: "<month year> doc.: IEEE < e> <July 2018>"— Presentation transcript:

1 doc.: IEEE 802.15-<15-09-0758-00-004e>
<month year> doc.: IEEE < e> <July 2018> Project: IEEE P Working Group for Wireless Specialty Networks (WSNs) Submission Title: [TG4z EIR Closing Report] Date Submitted: [12 July 2018] Source: [Tim Harrington] Company [Pro-ID] Address [Los Gatos, CA] Voice:[], Re: [TG4z EIR Closing Report for July 2018 interim session] Abstract: [IEEE TG4z EIR Closing Report for July 2018 interim session] Purpose: [IEEE TG4z EIR Closing Report for July 2018 interim session] Notice: This document has been prepared to assist the IEEE P It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P Tim Harrington (Pro-ID)

2 IEEE 802.15.4z EIR Closing report
<July 2018> IEEE z EIR Closing report July 12, 2018 Tim Harrington IEEE TG4z EIR Chair Tim Harrington (Pro-ID)

3 Jul 12, 2010 07/12/10 <July 2018> Contributions z-phy-mac-functional- description-changes-for-secure-authenticated- ranging.pptx z-proposal-to-15-4z-for- enhancing-uwb-phys.pptx z-hrp-uwb-phy- enhancements.pptx z-srdev-ppdu-for-enhanced- impulse-radio.pptx Tim Harrington (Pro-ID) Page 3

4 Additional Contributions
<July 2018> Additional Contributions z-questions-hrp-uwb-phy-proposals.pptx z-srdev-evaluation-criteria.pptx z-digital-sidelobe-minimization.pptx z-simultaneous-ranging.pptx z-hrp-data-mode-options.pptx Tim Harrington (Pro-ID

5 Merged Contributions - Progress
<July 2018> Merged Contributions - Progress Baseline Merge for HRP approved by unanimous consent z-srdev-phy-consensus.pptx Baseline Merge for LRP approved by unanimous consent z-phy-mac-functional-description-changes-for-secure-authenticated-ranging.pptx z-change-proposal-for-secure-authenticating-ranging-using-lrp-uwb-phy.pptx z-proposal-to-15-4z-for-enhancing-uwb-phys.pptx (LRP portion) Tim Harrington (Pro-ID

6 Jul 12, 2010 07/12/10 <July 2018> Timeline March 2018 – 2nd Call for proposals – resolved comments on PAR and CSD July 2018 – Review new proposals – Merge Baselines for draft September 2018 –Drafting using merged baselines November 2018 – Complete drafting - 1st letter ballot January 2019 – Comment Resolution – Recirculation ballot March 2019 – Comment Resolution – Start Sponsor ballot May 2019 – Comment Resolution – Forward to RevCom Tim Harrington (Pro-ID) Page 6

7 September Interim Scheduled 8 sessions
Jul 12, 2010 07/12/10 <July 2018> September Interim Scheduled 8 sessions Drafting using merged baseline for LRP and HRP Letter ballot? Tim Harrington (Pro-ID) Page 7


Download ppt "<month year> doc.: IEEE < e> <July 2018>"

Similar presentations


Ads by Google