Download presentation
Presentation is loading. Please wait.
1
NITS on OASIS Implementation
2
Agenda Designating/Terminating Fleet vs Unit Scheduling Rights
Tagging with NITS on OASIS Implementation Timeline Questions
3
Designate/Terminate Fleet vs Unit
Must specify a Gen Group
4
Designate/Terminate Fleet vs Unit
Specify Gen Group name here
5
Designate Fleet vs Unit
Gen Group or unit name here And here
6
Terminate Fleet vs Unit
Gen Group resource or unit Resource here And here
7
Scheduling Rights An additional form is available on the Add DNR template that allows for the specification of Scheduling Rights In general, Scheduling Rights should not be specified SCE&G has implemented a process whereby Scheduling Rights are automatically created The Scheduling Rights capacity will be equal to the amount of the DNR capacity Therefore SCE&G does not require nor expect customers to submit Scheduling Rights requests If submitted, the request will be set to Invalid
8
Tagging DNRs Source: Sink: Must match sink in NITS Load template
Owner: Must match Customer or Agent code in NITS Application OASIS: DNR – NITS Application reference number Secondary – OASIS Assignment reference number NITS Resource: DNR – Must match Resource Name in NITS DNR template Secondary – blank MW: Must be equal to or less than MW capacity designated in NITS DNR or Secondary template
9
Implementation Timeline and Mechanics
March 1 is deadline Will begin transitioning customers over to NITS next week (2-13) Once NITS implemented, old Network TSRs will be disabled Taken out of ATC calculation and capacity recalled At some point, they will be more permanently ended to clean things up Once switched over to NITS, please ensure all personnel doing Tagging have been notified of the switch
10
QUESTIONS?
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.