Roof Control Jeopardy
4
Roof Control Jeopardy Final Jeopardy
Dimensions CM Bolts General Unbolted Cuts Hodge Podge 100 200 300 400 500
5
Dimensions for 100 Our maximum approved entry and crosscut width is feet. Return
6
Dimensions for 200 Our approved roof control plan is approved for depths of cover of up to feet. Return
7
Dimensions for 300 When mining approaches within feet of an outcrop, approaches a burn line, or approaches a known fault … the plan shall be supplemented with additional support. Return
8
Dimensions for 400 Our minimum and maximum approved entry and crosscut centers are feet and feet. Return
9
Dimensions for 500 Where subnormal roof conditions are encountered, indicated, or anticipated, cuts will be At least one foot cut shall be taken after roof conditions have improved and the roof evaluated by the mine foreman or section foreman, before extended cuts are resumed. Return
10
CM for 100 Our maximum approved cut depth is feet. Return
11
CM for 200 Personnel shall be positioned in areas that are free of created by moving mining equipment. Return
12
CM for 300 In the event of a breakdown of the continuous mining machine inby permanent roof support, the unsupported area shall be to the extent possible. Return
13
CM for 400 A on the continuous miner shall be determined to indicate when the maximum approved cut depth has been reached. Return
14
CM for 500 When using temporary supports to reach a continuous mining machine that has broken down inby permanent roof supports, the temporary supports shall be installed on foot centers prior to starting work. These supports shall extend a minimum of inby the point at which work is to be performed. Return
15
Bolts for 100 The minimum roofbolt length approved in our roof control plan is inches. Return
16
Bolts for 200 The minimum roofbolt steel grade approved in our roof control plan is ksi. Return
17
Bolts for 300 Hole diameters will be from inch to inch larger than bolt diameters. Return
18
Bolts for 400 Holes for a 7’ roofbolt should be drilled to inches.
Holes for an 8’ truss anchor bolt should be drilled to inches. Return
19
Bolts for 500 Test holes will be drilled either during, or immediately after, the installation of the at the beginning of each in each , and at intervals of feet thereafter. Return
20
General for 100 If tunnel liners are to be used a - will be submitted.
Return
21
General for 200 A working face shall not be mined through into an unsupported area of active workings, except when the unsupported area is . Return
22
General for 300 Ribs shall be or supported by other means to ensure stability when a hazard exists. Return
23
General for 400 During mining and place changing, all personnel shall be positioned outby the , under supported roof. Return
24
General for 500 Mine personnel shall not proceed during face cutting operations. Return
25
Unbolted Cuts for 100 Roof support shall begin within hours after mining occurs, subject to availability of power, equipment and personnel. Return
26
Unbolted Cuts for 200 Temporary supports will not be used except when isolated mining conditions prevents deployment. Return
27
Unbolted Cuts for 300 Should it become necessary to leave a cut unbolted for days or more, the place shall be properly Return
28
Unbolted Cuts for 400 No cuts will be left unbolted over or any other period of days or more, subject to availability of power, equipment and personnel. Return
29
Unbolted Cuts for 500 When side cuts or breakthroughs are made from or into a previously bolted entry, no work or travel, except required examinations in or inby the intersection is permitted until: a) the side cut is supported with at least one row of , or b) the side cut contains a single row of , installed on foot centers, or c) the roof bolter is placed firmly against the roof. Return
30
Hodge Podge for 100 Test holes shall be drilled to a depth of at least inches above the anchorage horizon of the roofbolts being used. Return
31
Hodge Podge for 200 Resin grouted rods and other types of roof bolts shall not be interspersed in the pattern of installation unless they are used as . Return
32
Hodge Podge for 300 Resin packages shall be protected from excessive or during storage, and shall not be used if the shelf life is exceeded. Return
33
Hodge Podge for 400 Additional roof support shall be installed where:
1) the width of the opening specified in the roof control plan is exceeded by more than __ inches; and 2) the distance over which the excessive width exists is more than feet. Return
34
Hodge Podge for 500 Some roofbolt resin is marked with 3248M0510 on the label. What does this mean, and is this anchor resin or grout resin? 32 48 M 0510 Return
35
Final Jeopardy Category
Methane Tests
36
Final Jeopardy Question
A qualified person shall make tests for methane: i) in each working place before electrically operated equipment is energized; and ii) equipment is energized, taken into, or operated in a working place; and iii) At intervals, or more often if required in the approved ventilation plan at specific location, during the operation of equipment in the workplace.
37
The End Pretty Good Huh?