Presentation is loading. Please wait.

Presentation is loading. Please wait.

WG11 Snapshot January ‘11 Date: 16 -January-2011 Authors: Name Company

Similar presentations


Presentation on theme: "WG11 Snapshot January ‘11 Date: 16 -January-2011 Authors: Name Company"— Presentation transcript:

1 WG11 Snapshot January ‘11 Date: 16 -January-2011 Authors: Name Company
doc.: IEEE /1406r0 January 2011 WG11 Snapshot January ‘11 Date: 16 -January-2011 Authors: Name Company Address Phone Bruce Kraemer Marvell 5488 Marvell Ln Santa Clara, CA 95054 +1 - 321 4 27 4098 marvell .com Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

2 January 2011 doc.: IEEE /1406r0 January 2011 WG11 Task Group TGp PAR expires Dec 31, not needed, published TGs PAR expires Dec 31, One year extension approved by SASB TGu PAR expires Dec 31, Extension approved by EC Extension approved by SASB TGv PAR expires Dec 31, Extension approved by EC Extension approved by SASB Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

3 January 2011 Officers Bruce Kraemer (Marvell)

4 WG11 Task & Study Group Officers – as of Jan 2011
January 2011 doc.: IEEE /1406r0 January 2011 WG11 Task & Study Group Officers – as of Jan 2011 Cat Group Chair Vice Chair Technical Editor Secretary WG WG11 Bruce Kraemer Jon Rosdahl Adrian Stephens Peter Ecclesine Stephen McCann TG Mb Dorothy Stanley Michael Montemurro S Dee Denteneer Guido Hiertz Kazuyuki Sakoda Guenael Strutt U none Necati Canpolat Dave Stephenson V Emily Qi -OPEN- AA Ganesh Venkatesan Alex Ashley AC Osama Aboul-Magd Menzo Wentink, Joonsuk Kim AD Eldad Perahia Vinko Erceg, James Yee Carlos Cordeiro AE Henry Ptasinski AF Richard Kennedy Zhou Lan AH Dave Halasz Jae-Hyung Song SG AI Hiroshi Mano –pro tem Marc Emmelmann SC WNG Clint Chaplin Ad hoc ARC Dave Bagby JTC1 Andrew Myles REG Bruce Kraemer (Marvell) NYRQ = Not yet required, nominations are not open OPEN = Candidate Nominations are open Bruce Kraemer (Marvell)

5 WG11 Task & Study Group Officers – Jan 2011-adj
January 2011 doc.: IEEE /1406r0 January 2011 WG11 Task & Study Group Officers – Jan 2011-adj Cat Group Chair Vice Chair Technical Editor Secretary WG WG11 Bruce Kraemer Jon Rosdahl Adrian Stephens Peter Ecclesine Stephen McCann TG Mb Dorothy Stanley Michael Montemurro S Dee Denteneer Guido Hiertz Kazuyuki Sakoda Guenael Strutt U none Necati Canpolat Dave Stephenson V Emily Qi -OPEN- AA Ganesh Venkatesan Alex Ashley AC Osama Aboul-Magd Menzo Wentink, Joonsuk Kim AD Eldad Perahia Vinko Erceg, James Yee Carlos Cordeiro AE Henry Ptasinski AF Zhou Lan AH Dave Halasz Jae-Hyung Song SG AI Hiroshi Mano –pro tem Marc Emmelmann SC WNG Clint Chaplin Ad hoc ARC JTC1 Andrew Myles REG Bruce Kraemer (Marvell) NYRQ = Not yet required, nominations are not open OPEN = Candidate Nominations are open Bruce Kraemer (Marvell)

6 January 2011 Status Reports Bruce Kraemer (Marvell)

7 IEEE 802.11 Standards Pipeline
January 2011 doc.: IEEE /1406r0 January 2011 IEEE Standards Pipeline 802.11z TDLS 802.11s Mesh MAC 802.11r Fast Roam e QoS 802.11u WIEN 802.11k RRM h DFS & TPC 802.11aa Video Transport 802.11V Network Management 802.11Y Contention Based Protocol FIA i Security Smart Grid f Inter AP 802.11ae QoS Mgmt Frm 802.11p WAVE 802.11mb Revision ah a 54 Mbps 5GHz 802.11n High Throughput (>100 Mbps) 802.11af TVWS g 54 Mbps 2.4GHz 802.11ac VHT 5GHz 802.11W Management Frame Security 802.11ad VHT 60GHz 802.11b (’99) 11 Mbps 2.4GHz PHY Published Amendment Discussion Topics Study groups TG without draft WG Letter Ballot Sponsor Ballot Published Standard Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

8 WG11 Editor Abstract / Agenda – Jan 2011
July 2007 March 2010 January 2011 doc.: IEEE /0990r1 doc.: IEEE /1406r0 January 2011 WG11 Editor Abstract / Agenda – Jan 2011 Roll Call / Contacts / Reflector Go round table and get brief status report ANA Status / Process / What is administered Mandatory Editorial Coordination before SB Numbering Alignment process / Spreadsheet Amendment Ordering / Draft Snapshots MIB style and Frame practices (FrameMaker 9.0) Style Guide for Slide 8 Slide 8 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell) Page 8 Page 8 Terry Cole (AMD) Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

9 WNG SC – January 2011 Review of objectives
May 2008 January 2011 doc.: IEEE /1406r0 January 2011 WNG SC – January 2011 Review of objectives Handover in Vehicular Communications () – Woong Cho Review Objectives for March 2011 Meeting Bruce Kraemer (Marvell) 9 Page 9 Bruce Kraemer (Marvell)

10 802.11 ARC SC meets “as needed” Topics for January interim
May 2008 doc.: IEEE /0547r0 doc.: IEEE /1406r0 January 2011 IEEE ARC SC – January 2011 ARC SC meets “as needed” Topics for January interim 802.1 architecture document revision effort Goal is to complete comment resolution Dave not here- supporting from office Slide 10 Bruce Kraemer (Marvell) Page 10 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

11 TGREVmb - January 2011 This meeting Agenda in 11-11-0012 Draft Status
Month Year doc.: IEEE yy/xxxxr0 doc.: IEEE /1406r0 January 2011 TGREVmb - January 2011 This meeting Complete D6.0 Initial SB comment resolution Review timeline Agenda in Draft Status D6.01 incorporating 11p posted D6.02 incorporating 11z posted D6.03 – implementation of initial SB editorial comment resolutions posted D6.04 – initial SB technical comments approved Nov, posted D6.05 – Additional technical comments D7.0 – Sponsor recirc #1, Target open 12 Feb, 15 days Plan to incorporate published amendments (11v, 11u) during SB process. Assess 11s inclusion. Slide 11 Bruce Kraemer (Marvell) Page 11 John Doe, Some Company Bruce Kraemer (Marvell)

12 IEEE 802.11s Mesh Networking January 2011
September 2009 November 2009 January 2011 doc.: IEEE xxx doc.: IEEE /0547r0 doc.: IEEE /1406r0 January 2011 IEEE s Mesh Networking TGs had a successful ad hoc meeting in Munich, in which Draft 8.0, was prepared TGs Draft 8.0 passed the first Recirculation of its Sponsor Ballot (closing January 10) with 95.6% approval and 367comments. Both figures were slightly up compared to the initial Sponsor Ballot. The TGS Monday EVE session will be joint with TGmb to discuss the most appropriate sequencing of the drafts; TGs draft agenda is in submission 11-11/0010r0. The focus is on comment resolution Tentatively, we expect a first recirculation to happen shortly after the ad hoc in Eindhoven 1 editorial Technical/General Part of no vote 7 2% 113 31% Not part of no vote 177 48% 70 19% Slide 12 Slide 12 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell) Page 12 Page 12 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

13 IEEE 802.11u – January 2011 Draft D13.0 Plans for March 2011
May 2008 doc.: IEEE /0547r0 doc.: IEEE /1406r0 January 2011 IEEE u – January 2011 Draft D13.0 No new issues have arisen RevCom Continuous Process meeting 19th January 2011. 1 TGu meeting this week (Agenda: r0) Plans for March 2011 Hope to have finished before March 2011 Slide 13 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell) Page 13 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

14 TGv – January 2011 Current Status
doc.: IEEE /1406r0 January 2011 TGv – January 2011 Current Status On RevCom and Standards Board Continuous process agenda Jan/Feb 2011 Ninth Recirculation SB (closed ) 161 in ballot pool, 141/3/7 Y/N/A : 97.9% approve, 2% disapprove 1650 comments received, 1641 Technical, 2 Editorial, 7 General (1041 comments expand/duplicate 7 prior ballot comments) Comments in Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

15 IEEE 802.11aa – Los Angeles, CA Goals:
January 2011 May 2008 doc.: IEEE /xxxxr0 doc.: IEEE /1406r0 January 2011 IEEE aa – Los Angeles, CA Goals: Resolve LB170 comments and approve corresponding resolutions Start recirculation letter ballot Opening report in document 10/1404r0 Slide 15 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell) Page 15 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

16 January 2011 November 2010 doc.: IEEE /1406r0 doc.: IEEE /xxxxr0 January 2011 January 2011 IEEE ac – January 2011 Continue with Ad Hoc group meetings and straw polls Continue with the development of the Specification Framework document (11-09/0992r18). Select Technical Editor. Approve the first TG draft, D0.1 and start an informal TG review. Technical contributions Agenda in document 11-11/0011r0 Slide 16 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell) Page 16 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

17 TGad – Meeting Goals Continue comment resolution on D1.0
January 2011 doc.: IEEE /1406r0 January 2011 TGad – Meeting Goals Continue comment resolution on D1.0 Update on GHz for China WPAN Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

18 TGae January 2011 Summary Find a TG Secretary
Month Year doc.: IEEE yy/xxxxr0 doc.: IEEE /1406r0 January 2011 TGae January 2011 Summary Find a TG Secretary Complete LB 169 Comment Resolution Approve Recirculation LB Revise plan of record. Slide 18 Bruce Kraemer (Marvell) John Doe, Some Company Page 18 John Doe, Some Company Bruce Kraemer (Marvell)

19 TGaf – Meeting Goals January 2011
Review teleconference and Ad Hoc progress Complete draft restructuring – moving regulations to annexes Make any other necessary edits Create draft d1.0 Request to start first WG Letter Ballot Plan for March Plenary in Singapore Slide 19 Slide 19 Bruce Kraemer (Marvell)

20 Submissions to help draft text
Month Year January 2011 doc.: IEEE /0587r0 doc.: IEEE /1406r0 January 2011 January 2011 IEEE ah Snapshot Submissions to help draft text Use cases Channel models Initial PHY proposal submissions 10/1373 Call for proposals Regulatory submissions MAC submissions Slide 20 David Halasz, OakTree Wireless Bruce Kraemer (Marvell) Page 20 David Halasz, Aclara Bruce Kraemer (Marvell)

21 802.11 TGai (FILS) – Los Angeles, Jan 2011
January 2011 May 2008 doc.: IEEE /1406r0 doc.: IEEE /xxxxr0 January 2011 January 2011 TGai (FILS) – Los Angeles, Jan 2011 Goals for the Los Angeles Meeting: Review and Approve the Dallas and Teleconference meeting minutes Reporting November EC and December NesCom Officer elections Presentation of submissions TIME line of task group Plan for March & Teleconference Slide 21 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell) Page 21 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

22 January 2011 May 2008 doc.: IEEE /0547r0 doc.: IEEE /1406r0 January 2011 IEEE JTC1 ad hoc – Jan 2011 The agenda items that will be addressed this week are: Approve minutes from previous meetings Review current goals of JTC1 ad hoc Focused on & WAPI issues Discuss expansion of goals of JTC1 ad hoc to cover all aspects of IEEE 802 to JTC1/SC6 relationship Including issues related to NP proposals for 802.1X/AE & security Review status of Sponsor Ballot drafts sent to ISO/IEC JTC1/SC6 Review status of liaisons sent to ISO/IEC JTC1/SC6 10/1358 in relation to claims of insecurity 10/1359 in relation to conflict of /WAPI identifiers Discus of plans to submit to ISO/IEC JTC1/SC6 In context of SC6 review of :2005 Slide 22 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell) Page 22 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

23 Regulatory Ad Hoc Committee Meeting Goals January 2011
The regulatory summaries Regulatory issues status FCC open issues The FCC petitions 10-196: Innovation in the Broadcast Television Bands 10-197: Experimental license rules 10-198: Promoting More Efficient Use of Spectrum Through Dynamic Spectrum Use Technologies EN revision update; actions in TG11 FCC 5 GHz rules changes update Critical issues actions FCC Reply Comments ETSI Smart Grid and Wi-Fi Slide 23 Bruce Kraemer (Marvell)

24 Tuesday pm1 & Thursday am1
January 2011 doc.: IEEE /1406r0 January 2011 Smart Grid – January 2011 Tuesday pm1 & Thursday am1 Revision of Wireless Technology Matrix used in NIST Smart Grid PAP#2 Report. Australian Smart Metering RFI UK Consultation Update of activities in P2030 Open SG ITU Focus Group Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

25 January 2011 Recent Ballots Bruce Kraemer (Marvell)

26 Recent Ballot History Year Inter meeting Period Ballots Completed 2010
January 2011 Recent Ballot History Year Inter meeting Period Ballots Completed 2010 July - Sept 9 Sept - Nov 6 2010/2011 Nov - Jan 4 Bruce Kraemer (Marvell)

27 P802.11s – 1st Recirc - Sponsor January 2011
doc.: IEEE /1406r0 January 2011 P802.11s – 1st Recirc - Sponsor The IEEE P802.11s (MESH networking) 21 day recirculation Sponsor Ballot asked the question “Should  P802.11s  Draft 8.0 be forwarded to RevCom?” The official results for this Sponsor Ballot  follow: Ballot Opening Date:   Monday  December 20, 2010 - 23:59 ET Ballot Closing Date:     Monday      January 10, 2011 - 23:59 ET  RESPONSE RATE: 184 eligible people are in this ballot group.     131 affirmative votes 6 negative votes with comments 0 negative votes without comments 11 abstention votes ======= 148  votes received  =  80.4 % valid returns                    =  7.4% valid abstentions   APPROVAL RATE: 131  affirmative votes       =      95.6 % affirmative    6  total negative votes  =     4.4  % negative The motion passes. There were 367 comments received Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

28 P802.11u – 5th Recirc - Sponsor January 2011
The 10 day  IEEE P802.11u (Interworking with External Networks) 5th recirculation Sponsor Ballot asked the question “Should  P802.11u  Draft 13.0 be forwarded to RevCom?” The official results for this Sponsor Ballot follow: Ballot Opening Date:    Thursday       November  11 , 2010 - 23:59 ET Ballot Closing Date:       Sunday           November  21, 2010 - 23:59 ET  RESPONSE RATE: 154 eligible people are in this ballot group.   128 affirmative votes     1 negative vote with comments     0 negative votes without comments   14 abstention votes ======= 143  votes received  =  92.9 %   returns                           =    9.8% valid abstentions APPROVAL RATE: 128  affirmative votes       =      99.2 % affirmative     1  total negative votes   =        0.8  % negative Motion passes There were zero comments received\ Bruce Kraemer (Marvell)

29 P802.11v – 9th Recirc - Sponsor January 2011
The 10 day, ninth recirculation Sponsor Ballot  for IEEE P802.11v (Wireless Network Management) asked the question “Should  P802.11v  Draft 16.0 be forwarded to RevCom?” The official results for this Sponsor Ballot follow: Ballot Opening Date:    Friday               November 05, 2010 - 23:59 ET Ballot Closing Date:      Monday           November 15, 2010 - 23:59 ET  RESPONSES: 161 eligible people are in this ballot group.     141 affirmative votes     3 negative votes with comments     0 negative votes without comments     7 abstention votes ======= 151  votes received  =  93.8% valid returns                                       =    4.6 % valid abstentions   APPROVAL RATE: 141  affirmative votes         =     97.9 % affirmative     3  total negative votes    =       2.1  % negative The Motion passes. There were 1650 comments received Bruce Kraemer (Marvell)

30 P802.11 – 1st Recirc - WG January 2011
IEEE WG Letter Ballot #170  was a  15 day Working Group recirculation Technical Ballot asking the question "Should P802.11aa D2.0 be forwarded to Sponsor Ballot?"   Ballot Opening Date:   Tuesday             November  23, 2010 - 23:59 ET Ballot Closing Date:     Wednesday       December 08, 2010 - 23:59 ET  RESPONSE RATE: 257eligible people are in this ballot group.     117 affirmative votes 32 negative votes     36 abstention votes ===   185  votes received  =  72.0% valid returns                           =  19.5% valid abstentions   APPROVAL RATE: 117  affirmative votes       =      78.5 % affirmative   32  total negative votes  =      21.5 % negative There were 352 comments received.               Bruce Kraemer (Marvell)


Download ppt "WG11 Snapshot January ‘11 Date: 16 -January-2011 Authors: Name Company"

Similar presentations


Ads by Google