Presentation is loading. Please wait.

Presentation is loading. Please wait.

OPERATIONAL EXCELLENCY

Similar presentations


Presentation on theme: "OPERATIONAL EXCELLENCY"— Presentation transcript:

1 OPERATIONAL EXCELLENCY
Presented by Eng. Francis Kawa Leaders annual conference: 7th – 8th November 2018 Disclaimer: No part of this report may be circulated, quoted, or reproduced for distribution without prior written approval from KenGen. All the information contained herein was prepared for information only.

2 2017/18 FY Comparison of Q1 2017/18 & 2018/19 Revenue
PPA Target Kshs M Actual Kshs M Variance (kshs M) Variance % Capacity Revenue 22,867.9 21,160.1 ( ) (4.47) Energy Revenue 8,614.1 8,191.3 (422.8) (4.91) Total Revenue 31,482.00 29,351.40 (2,130.60) (6.77) Comparison of Q1 2017/18 & 2018/19 Revenue Actual (kshs M) 1st Quarter 2017/18 Actual (kshs M) 1st Quarter 2018/19 Variance (kshs M) Variance % Capacity Revenue 5,214.8 5,481.2 266.4 5.11 Energy Revenue 2,011.2 2,088.6 77.4 3.85 Total Revenue 7,226.0 7,569.8 343.8 4.76

3 Procurement process is very slow
OPEX initiatives 2019/20 Strategic Initiative/ Projects R A S/C I Budget (KShs 'M) Remarks Reliability Centered Maintenance (Manitoba and Toshiba) for both OD and GD OD&GDD HRA, FICT, SC ExCo 100 There has been challenges funding training programs from HR. Get training on RCM Ultimate cell for Kipevu RM - Kipevu OD SC, OD 60 Use of hydrogen gas to enhance combustion thus reducing emission, reduce SFC (saving 15% of fuel) and improving its position on the merit order Harmonization of spare codes/material clean up SCM SCD OD, GDD, FICT, SID 20 SLA/Consignment agreement with key OEM/Authorized agents CSLA, FICT, OD, GDD  Procurement process is very slow

4 2019/20 Strategic Initiative/ Projects
S/C I Budget (KShs 'M) Remarks Centralized Dispatch Center OD&GDD OD& GDD SC, FICT ExCo 600 Centralized command of the plants, enhance implementation of AGC, enabler of operations analysis and support centralized maintenance team To be integrated with the new security surveillance system Gitaru rehabilitation RM-Eastern OD SC, FICT,CSLA 300 Excitation systems and the generators There is a concern on recovery of funds spent in rehabilitation projects from the PPA Consultancy for Sangoro bypass channel RM-Western FICT, BDD, SC 50 Study on improvement f irrigation channel in view of operating Sangoro when Sondu machines are unavailable Kindaruma Desiltation SC, FICT,CSR Identify a contractor to desilt, separate the sand and sell it. The proceeds pay for the contractor's cost and the balance be given to the community

5 Wellhead Plants` optimization
2019/20 Strategic Initiative/ Projects R A S/C I Budget (KShs 'M) Remarks Wellhead Plants` optimization OPS - GDD GDD OD, SC, FICT ExCo 800 Relocation of welheads on OW-908 and 919 to wells with sufficient steam (5MW) and purchase smaller ones (2 - 3 MW) to replace them. Also, replacement of turbine rotor for Eburru Concern on speed of steam conversion Garissa Solar O&M  TSM  OD  CRS, FICT  ExCo There has been a great influence from KenGen to REA and as a result there is a negotiation meeting slated for 9th November 2018 Improving wrench time  RMs & OMs  OD & GDD  SC, FICT 100 Establish a tool store in every station managed by Operations staff. Have state of the art/modern tools. Have a well equipped vehicle for responding to machine breakdowns for Olkaria and CEW. Annual tool inventory

6 Insurance premiums for motor vehicles
2019/20 Strategic Initiative/ Projects R A S/C I Budget (KShs 'M) Remarks SAP PM module  RMs & OMs  OD & GDD SC, FICT  ExCo  30 To improve on use and quality of the PM. Conduct a certification training. Concern on coordination of global activities e.g awareness sessions Insurance premiums for motor vehicles  Insurance CSLA  Have third party insurance policy for cars >5years or have zero book value. Save 20 M (Pay 40M instead of 60M) To align with the motor vehicle insurance policy Overtime Delay in employment of staff More support staff are being employed instead of technical staff

7 Consider maintaining the teams for progress monitoring


Download ppt "OPERATIONAL EXCELLENCY"

Similar presentations


Ads by Google