Download presentation
Presentation is loading. Please wait.
1
ESSnet on Consistency Workshop
Gresham Hotel, Dublin, 24th and 25th of April 2012
2
Business register as basis for sample frames
Fabio Tomasini 25th April 2012
3
Contents Basis of the Swiss survey frame Survey frame system
Managing survey frame Coordination survey frame
4
1. Basis of the Swiss survey frame
The economics statistical survey frame is based on the business register; The enterprise is the basic statistical unit; At the moment, FSO uses only one survey frame for all economics statistical survey; Each year a new survey frame is provided with all metadata: The coordination of the drawing-samples must be insured. The burden on enterprise can be spread/reduced by using this system. The survey frames is based on the Business register. This survey frame is used for all economics surveys. Each year a new survey is prepared. The metadata are provide to treat de changes in between one year. The idea is to have the best frame each year and to dispose of the information that could help the interpretation in structural changes. The system designed is planned also to take care to the coordination. The burden should be distributed throuout all enterprise and a control should be possible. This system is non planned to avoid the use of units, but to control and distribute the participation. year after year.
5
2. Basis of the Swiss survey frame
The business register is continuously updated during the year; the structures and all statistical information are integrated; profiling, profiling light, others surveys; Each year the available administrative information is also integrated: employment and turnover; The NACE Code is updated in regular basis; All information has its own reference period (time stamp). The survey frames is based on the Business register. This survey frame is used for all economics surveys. Each year a new survey is prepared. The metadata are provide to treat de changes in between one year. The idea is to have the best frame each year and to dispose of the information that could help the interpretation in structural changes. The system designed is planned also to take care to the coordination. The burden should be distributed thru all enterprise and a control should be possible. This system is non planned to avoid the use of units, but to control and distribute the participation. year after year.
6
3. Basis of the Swiss survey frame
Survey frame ≠ Structural Statistic (SWIS); Survey frame = Structure of the statistical units at the year A, enhanced with statistical information from year A or A-1 or A-2 according to the update timeliness; Structural Statistic = Structure and statistical information corresponding to the same period year A-2. The survey frames is based on the Business register. This survey frame is used for all economics surveys. Each year a new survey is prepared. The metadata are provide to treat de changes in between one year. The idea is to have the best frame each year and to dispose of the information that could help the interpretation in structural changes. The system designed is planned also to take care to the coordination. The burden should be distributed thru all enterprise and a control should be possible. This system is non planned to avoid the use of units, but to control and distribute the participation. year after year.
7
Employment (Social security)
4. Survey Frame System Turnover (VAT) Employment (Social security) Continuously updating unit structure: New entries Changes Cessation year A BR BR year A - 1 year A - 2 Continuously updated statistical information: Employment data Turnover Export/import data Structural Statistics Survey Frame
8
5. Managing survey frame During the year a survey frame is used, a quarterly reporting is provided with the main changes in the survey frame (new entry, cessations or others changes) These changes can be used to describe modifications in the population survey and to manage and help the extrapolation methods Checks in the population can also be performed in order to provide additional information in the structural changes The survey frames is based on the Business register. This survey frame is used for all economics surveys. Each year a new survey is prepared. The metadata are provide to treat de changes in between one year. The idea is to have the best frame each year and to dispose of the information that could help the interpretation in structural changes. The system designed is planned also to take care to the coordination. The burden should be distributed thru all enterprise and a control should be possible. This system is non planned to avoid the use of units, but to control and distribute the participation. year after year.
9
6. Managing survey frame Each year a new survey frame is prepared as an update from the previous frame with all information gathered throughout the year; All rules of continuity are used. The purpose of this practice is to determine what information on past framework may be transmitted to units of the new framework, and under what circumstances; Using some basics principles in updating the survey frame. The survey frames is based on the Business register. This survey frame is used for all economics surveys. Each year a new survey is prepared. The metadata are provide to treat de changes in between one year. The idea is to have the best frame each year and to dispose of the information that could help the interpretation in structural changes. The system designed is planned also to take care to the coordination. The burden should be distributed thru all enterprise and a control should be possible. This system is non planned to avoid the use of units, but to control and distribute the participation. year after year.
10
7. Managing survey frame Transmission of characteristics :
in case a unit appears without inheritance, a new random number is assigned If a unit has predecessors that are able to transmit their past, it is possible to choose to use completely the characteristics of one of these units; Preserving the independence between units By experience, a unit cannot pass characteristics (and therefore its random number) to more than one other enterprise; The survey frames is based on the Business register. This survey frame is used for all economics surveys. Each year a new survey is prepared. The metadata are provide to treat de changes in between one year. The idea is to have the best frame each year and to dispose of the information that could help the interpretation in structural changes. The system designed is planned also to take care to the coordination. The burden should be distributed thru all enterprise and a control should be possible. This system is non planned to avoid the use of units, but to control and distribute the participation. year after year.
11
8. Managing survey frame Continuity of the identity
This rule is necessary to follow the fusions of enterprises The survey frames is based on the Business register. This survey frame is used for all economics surveys. Each year a new survey is prepared. The metadata are provide to treat de changes in between one year. The idea is to have the best frame each year and to dispose of the information that could help the interpretation in structural changes. The system designed is planned also to take care to the coordination. The burden should be distributed thru all enterprise and a control should be possible. This system is non planned to avoid the use of units, but to control and distribute the participation. year after year.
12
9. Managing survey frame The survey frames is based on the Business register. This survey frame is used for all economics surveys. Each year a new survey is prepared. The metadata are provide to treat de changes in between one year. The idea is to have the best frame each year and to dispose of the information that could help the interpretation in structural changes. The system designed is planned also to take care to the coordination. The burden should be distributed thru all enterprise and a control should be possible. This system is non planned to avoid the use of units, but to control and distribute the participation. year after year. The changes are detected and treated following the rules that are explained in the «Manual of Coordinate survey system for enterprises – SVS»
13
10. Coordination survey frame
The first file contains the sampling frame updated with a complete description of the multidimensional sample corresponding to all previous surveys. This information is necessary in order to organize a new survey coordinated with previous surveys. The survey frames is based on the Business register. This survey frame is used for all economics surveys. Each year a new survey is prepared. The metadata are provide to treat de changes in between one year. The idea is to have the best frame each year and to dispose of the information that could help the interpretation in structural changes. The system designed is planned also to take care to the coordination. The burden should be distributed thru all enterprise and a control should be possible. This system is non planned to avoid the use of units, but to control and distribute the participation. year after year.
14
11. Coordination survey frame
The second file contains the sample selected for the survey that is being organized. One may note that if this survey is a rotating panel, it is decomposed into subsurveys groups of rotation. We can therefore immediately know which units should leave the sample to the next wave or those after. The other files produced will be used to assess the burden on enterprise and to follow performance of the coordination survey frame. The survey frames is based on the Business register. This survey frame is used for all economics surveys. Each year a new survey is prepared. The metadata are provide to treat de changes in between one year. The idea is to have the best frame each year and to dispose of the information that could help the interpretation in structural changes. The system designed is planned also to take care to the coordination. The burden should be distributed thru all enterprise and a control should be possible. This system is non planned to avoid the use of units, but to control and distribute the participation. year after year.
15
12. References Qualité, L. (2011), Système d’enquêtes coordonnées pour les entreprises – SVS, version 1.0, Office fédéral de la statistique, 2011. Qualité, L. (2009). Unequal probability sampling and repeated surveys. Thèse de doctorat, Université de Neuchâtel, Neuchâtel, Suisse. The survey frames is based on the Business register. This survey frame is used for all economics surveys. Each year a new survey is prepared. The metadata are provide to treat de changes in between one year. The idea is to have the best frame each year and to dispose of the information that could help the interpretation in structural changes. The system designed is planned also to take care to the coordination. The burden should be distributed thru all enterprise and a control should be possible. This system is non planned to avoid the use of units, but to control and distribute the participation. year after year.
16
13. References Paul-André Salamin, Measuring the performance of a sample coordination system, EESW09, The survey frames is based on the Business register. This survey frame is used for all economics surveys. Each year a new survey is prepared. The metadata are provide to treat de changes in between one year. The idea is to have the best frame each year and to dispose of the information that could help the interpretation in structural changes. The system designed is planned also to take care to the coordination. The burden should be distributed thru all enterprise and a control should be possible. This system is non planned to avoid the use of units, but to control and distribute the participation. year after year.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.