Steve Rueckert Director of Standards WSC Meeting Overview
March 5, 2019 Steve Rueckert Director of Standards
2
INT-009-WECC-CRT-2 Capacity e-Tag Functionality
Motion to forward to WECC Board of Directors with request for approval Five-year review 1) The Purchasing-Selling Entity was replaced with a newly-created applicable entity, “Any NAESB registered Entity (NRE),”, 2) measures were conformed to current drafting conventions, 3) rationale section was updated / use of proper nouns, and 4) syntax was corrected. 100 percent approval / no minority position
3
IRO-002-5, RC Monitoring/Analysis Regional Variance
Motion to forward to WECC Board of Directors with request for approval Reliability Coordinators (RC) serving the Western Interconnection to: 1) develop a common Interconnection-wide method to determine the modeling and monitoring of elements necessary for providing operational awareness, and 2) use the method. 100 percent approval Minority positions: use a specified model / “necessary” is ambiguous
4
BAL-002-WECC-2a Contingency Reserve
Motion to proceed to ballot Request to retire Requirement R2 as redundant to NERC BAL-003 (Frequency Response) Retire: BA/RSG to maintain at least ½ Contingency Reserve as Operating Reserve – Spinning that is: 1) is immediately and automatically responsive to frequency deviations through governor action or other control system, and 2) capable of fully responding within ten minutes
5
Standard Authorization Request
Motion to approve SAR / solicit a drafting team SAR WECC-0137 Mandated five-year review INT-018-WECC-CRT-1.2, Use of e-Tag Energy Product Codes Specific to the WECC Generic review of the entire document
6
WECC Guideline Assignment of Drafting Teams
Motion to approve WECC Standards Committee Assignment of Drafting Teams (a WECC Guideline) Uniform treatment when multiple candidates from the same company volunteer for a single team Where multiple drafting team nominees from the same firm seek assignment to a single drafting team, that assignment is permissible; however, the represented entity has only one vote on matters presented to the drafting team for ballot. Where presented with a list of drafting team nominees proposed for assignment to a drafting team created per the Procedures, the WSC may request that the names of nominees be kept confidential until assignment has been made.
7
W. Shannon Black WECC Consultant, Standards Processes (503)