1 Logistics Metric Analysis Reporting System REPORTS
Kenneth R. Deans, DLMS PMO December 15, 2016

2 Logistics Metric Analysis Report System
LMARS Output Reports: . C Output Reports. All Reports are displayed in a standard format. The titles of the Major Report Categories, the Sections, and the Sub-sections are all centered on report pages. Guard Reserves Wholesale ICP Contractor Wholesale ICP Wholesale ICP Reparables NSNs ICP GSA No goal exists for this metric due to dependency on other variables (TDDs, Supply Availability Goals etc.)

3 Logistics Metric Analysis Report System
LMARS LRT Reports: Guard C “GUARD” Report. To be included in the Guard Report, the document number’s Ship-To address or Consignee must be an identified Guard DoDAAC. Note that the document numbers included in the Guard Report are not included in the Composite Report, paragraph C above. DLA Transaction Services maintains an internal table of DoDAACs supplied by the Components that identifies Guard unit DoDAACs. No goal exists for this metric due to dependency on other variables (TDDs, Supply Availability Goals etc.)

4 Logistics Metric Analysis Report System
Composite Guard Report Total Composite Guard LRT Total Orders: 115,107 Total Receipt Times in days: 24.1

5 Logistics Metric Analysis Report System
Composite Guard Report Reduced from 32.6 to 24.12

6 Logistics Metric Analysis Report System
LMARS LRT Reports: Reserve C “RESERVE” Report. To be included in the Reserve Report the document number’s Ship-To address or Consignee must be an identified Reserve DoDAAC. Note that the document numbers included in the Reserve Report are not included in the Composite Report, paragraph C above. DLA Transaction Services maintains an internal table of DoDAACs supplied by the Components that identifies Reserve unit DoDAACs. No goal exists for this metric due to dependency on other variables (TDDs, Supply Availability Goals etc.)

7 Logistics Metric Analysis Report System
Composite Reserve Report Total Composite Reserves LRT Total Orders: 17,706 Total Receipt Times in days: 30.0

8 Logistics Metric Analysis Report System
Composite Reserve Report Reduced from 55.4 to 30.0

9 Logistics Metric Analysis Report System
LMARS LRT Reports: Wholesale ICP C “Wholesale ICP” Report. The Composite Report includes all document numbers eligible for LMARS reporting in a given month with the exception of those for Guard, Reserve, or Contractor DoDAACs. No goal exists for this metric due to dependency on other variables (TDDs, Supply Availability Goals etc.)

10 Logistics Metric Analysis Report System
Composite Wholesale ICP Report Total Composite Wholesale ICP LRT Total Orders: 2,321,932 Total Receipt Times in days: 11.3 Total 95% Composite Wholesale ICP LRT Total 95% Orders: 2,205,835 Total Receipt Times in days: 8.4

11 Logistics Metric Analysis Report System
Composite Wholesale ICP Report Reduced from 15.4 to 11.3 95% TPT 11.2 to 8.4

12 Logistics Metric Analysis Report System
LMARS LRT Reports: Contractor Wholesale ICP C “CONTRACTOR” Report. To be included in the Contractor Report the document number’s Ship-To or Consignee address must be an identified Contractor DoDAAC. Note that the document numbers included in the Contractor Report are not included in the Composite Report, paragraph C above. Contractor DoDAACs are identified according to Table H. No goal exists for this metric due to dependency on other variables (TDDs, Supply Availability Goals etc.)

13 Logistics Metric Analysis Report System
Composite Contract Wholesale ICP Report Total Composite Contract Wholesale ICP LRT Total Orders: 51,007 Total Receipt Times in days: 8.5

14 Logistics Metric Analysis Report System
Composite Contract Wholesale ICP Report Reduced from 12.1 to 8.5

15 Logistics Metric Analysis Report System
LMARS LRT Reports: Wholesale ICP Reparable NSNs C “REPAIRABLE NIIN” Report. The Reparable NIIN Report includes a subset of the document numbers in the Composite Report. To be included in the Reparable NIIN report the NIIN being ordered on a given document number must be identified as a Reparable NIIN by at least one Service. No goal exists for this metric due to dependency on other variables (TDDs, Supply Availability Goals etc.)

16 Logistics Metric Analysis Report System
Composite Wholesale ICP Reparable Report Total Composite Wholesale ICP Reparable LRT Total Orders: 30,508 Total Receipt Times in days: 53.1 Total 95% Composite Wholesale Reparable ICP LRT Total 95% Orders: 28,983 Total Receipt Times in days: 36.0

17 Logistics Metric Analysis Report System
Composite Wholesale ICP Reparable Report Reduced from 53.8 to 53.1 95% TPT 37.3 to 36.0

18 Logistics Metric Analysis Report System
LMARS LRT Reports: ICP GSA “ICP GSA” Report. The ICP GSA Report includes all document numbers eligible for LMARS reporting in a given month with the ICP as GSA and exception of those for Guard, Reserve, or Contractor DoDAACs. No goal exists for this metric due to dependency on other variables (TDDs, Supply Availability Goals etc.)

19 Logistics Metric Analysis Report System
Composite GSA ICP Report Total Composite GSA ICP LRT Total Orders: 59,622 Total Receipt Times in days: 72.7 Total 95% GSA Wholesale ICP LRT Total 95% Orders: 56,640 Total Receipt Times in days: 61.6

20 Logistics Metric Analysis Report System
Composite GSA ICP Report Reduced from 96.5 to 72.7 95% TPT 77.5 to 61.6