1
Layout of passages between TT2 and TT2A
CERN AB-ATB-EA VRVS session, 8th March 2006 VRVS session, 8th March 2006 CERN AB-ATB-EA
2
Updated ACAD file https://edms.cern.ch/document/695011/
Actual cryogenics line Entrance modifications Passages TT2/TT2A Cinematics VRVS session, 8th March 2006 CERN AB-ATB-EA
3
Layout of the passages 3 holes Downstream holes
1x upstream of solenoid: cryogenic lines (dia 30 cm) 2 x downstream of solenoid: other (dia each 20 cm) Downstream holes 1: fragile parts (fibers, detector signals ...) 2: high pressure hoses Passages with interior lining of stainless steel VRVS session, 8th March 2006 CERN AB-ATB-EA
4
Passages (top view) A B C VRVS session, 8th March 2006 CERN AB-ATB-EA
5
Passages (cut view 1) A C B VRVS session, 8th March 2006
CERN AB-ATB-EA
6
Passages (cut view 2) A B,C 0.4-0.7 m VRVS session, 8th March 2006
CERN AB-ATB-EA
7
Length of fiber path From z=0 to exit into TT2 5.8 m See orange line
VRVS session, 8th March 2006 CERN AB-ATB-EA
8
Schedule VRVS session, 8th March 2006 CERN AB-ATB-EA