Beam Line to the HiRadMat Test Facility

Similar presentations


Presentation on theme: "Beam Line to the HiRadMat Test Facility"— Presentation transcript:

1 Beam Line to the HiRadMat Test Facility
Christoph Hessler for TE/ABT/BTP Discussion of technical options and resources for HiRadMat

2 Required Beam Parameters
Unit Value (proton beam) Value (lead ion beam) Beam energy GeV 450 36.9×103 (177.4 GeV/n) Bunch intensity particles 5×109 to 1.15×1011 5×109 to 4.1×1010 Bunch length cm 11.2 Number of bunches - 1 – 288 1 – 592 Bunch spacing ns 25 ≥ 25 Pulse energy MJ 2.4 28×10-3 Pulse length ms 7.2 Peak power GW 340 2.3 Normalized emittance (1s) mm 3.5 1.4 sx × sy at exp. (baseline) mm2 1.0 sx × sy at exp. (request) 0.25 – 4.0 Christoph Hessler, TE/ABT/BTP

3 Studied Locations for HiRadMat
Beam Christoph Hessler, TE/ABT/BTP

4 Studied Locations for HiRadMat
TT60 Beam SPS TI 2 T1 target area (option B) Beam TT61 tunnel (option C) End of common part with TI 2 transfer line T9 target area / WANF (option A) 50 m Christoph Hessler, TE/ABT/BTP

5 Beam Line Layouts T9 (option A): MBS switching magnets B190 QTL MBB
T1 (option B): T1 target T9 target TT61 (option C): QTR MBE TT60: Common part with TI 2 New transfer line 50 m Christoph Hessler, TE/ABT/BTP

6 Optics Simulations (T9)
Example: Beam radius (1s) at target: 1.0 mm x (m) y (m) s (m) s (m) Christoph Hessler, TE/ABT/BTP

7 Design Aspects Flexible design to cover a wide range of beam sizes
Optimized beam line design in order to use recuperated equipment wherever possible → no new magnets needed Series powering of magnets wherever possible to reduce number of power converters Christoph Hessler, TE/ABT/BTP

8 Cost Estimate T9 (option A) T1 (option B) TT61 (option C)
Magnet refurbishment 250 185 Cabling 360 450 Transport/installation 110 Survey 45 35 40 Power convertors 600 595 560 Vacuum system 245 215 225 Beam instrumentation 240 Water cooling 125 120 115 Controls 55 Interlock Draftsman office 15 Total 2,100 1,985 2,050 all prices in kCHF Christoph Hessler, TE/ABT/BTP

9 Remarks on the Cost Estimate
No contingency included Cost estimate is for beam line only and is based on agreed beam delivery points ~250 kCHF could be saved if non-standard not refurbished power convertors would be used, but exploitation costs will be ~450 kCHF higher Need a decision now to meet 2010 start-up deadline Christoph Hessler, TE/ABT/BTP

10 Thank You! M. Meddahi, B. Goddard (TE/ABT/BTP)
D. Smekens, J. Bauche (TE/MSC) C. Bertone (EN/HE) D. Missiaen (BE/ABP) A. Beuret, G. Le Godec (TE/EPC) G. Vandoni (TE/VSC) R. Jones (BE/BI) B. Pirollet (EN/CV) J. Wenninger (BE/OP) J. Ramillon (EN/MEF) Christoph Hessler, TE/ABT/BTP


Download ppt "Beam Line to the HiRadMat Test Facility"

Similar presentations


Ads by Google