Download presentation
Presentation is loading. Please wait.
Published byJohannes Nurminen Modified over 5 years ago
1
WRAP Regional Haze Planning Schedule of Communication
D R A F T Spring Begin regular stakeholder engagement on source screening and control measures Summer Continue regular stakeholder engagement on source screening and control measures 2019 Fall Host meeting with stakeholders to discuss steps taken to date, process moving forward, proposed control measures, projected visibility improvement State-tribal coordination through EPA and for sources requiring controls on tribal lands Winter Spring Continue stakeholder engagement on draft control plan 2020 Summer State-tribal coordination on draft SIPs/TIPs Fall Begin formal comment period Winter Indicates Significant Tribal C&C Milestone Respond to comments, revise plan as necessary Spring 2021 Timeline includes selected items from the WRAP Schedule of Communication described in the Consultation and Coordination Framework, with important tribal consultation and coordination milestones added Submit final SIP/TIP to EPA Summer EPA consultation with tribes before acting on SIPs/TIPs Fall
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.