Presentation is loading. Please wait.

Presentation is loading. Please wait.

SAUG and SACE: Status Report

Similar presentations


Presentation on theme: "SAUG and SACE: Status Report"— Presentation transcript:

1 SAUG and SACE: Status Report
Point 2.3 SAEG Meeting – July 7th, 2015 SACE

2 Outline Quick report on what has already been achieved by SAUG and SACE JDemetra+, Documentation, Helpdesk, Assistance, Trainings etc. What is on the agendas of the 2 groups JDemetra+, Plug-ins, Training, studies etc. SACE

3 SAUG and SACE meetings, reports
Intermediary report (first year of activity) released in April 2015; Last coordination meeting in Paris (19/05/2015) SAUG Last meeting in Paris (18/05/2015) All minutes, reports and documents available on the CROS portal SACE

4 What has been achieved? Release of JD+ 2.0.0 in February
Long testing period by SACE and SAUG Complete documentation available (see next presentation by SG) Moving to JD Already done or on-going in several institutes : INE Portugal, INSEE, STATEC, Eurostat (some units), TurkStat, Statistics Finland etc. Coaching : Statistics Denmark, ELSTAT, CSO Ireland SACE

5 Cooperation SAUG-SACE on JD+
Members of the 2 groups test JD+ and prepare (or did) the move to JD+. Some points raised by the SAUG: Seasonality Tests: Definition, Comparison AMI in JD+ Tramo: Parsimony of ARIMA models SACE

6 Helpdesk Very active Some statistics as of 10/06/2015
64 questions, 32 institutes 2 technical problems with JIRA: link broken and large delay in the answer for several cases. # of Posts Other Cases # of Cases # of Real Questions Institutes % Solved Average Duration 82 3 85 64 32 100.00 5.81 SACE

7 Training and Coaching Training at ELSTAT in February; coaching since.
Working with Statistics Denmark (Karen Keller) to use JD+ through SAS Working with Irish CSO (Brian Cahill) to move to JD+ SACE

8 International Conferences
To promote JD+ NTTS 2015 (Brussels, May 2015) 35th International Symposium on Forecasting (Riverside, June 21-24). SACE

9 On the Agenda (1) Ongoing improvement of the documentation
Ongoing testing of JD+, Helpdesk Migration to JD+ SAUG will pilot a template on different institutes SA practices and plans. Using JD+ in production: various experiments Using the cruncher with SAS. Using JD+ modules with R. Using a web service. SACE

10 On the Agenda (2) Training for users Training for developers
Lots of material from SACE members and partners. Synthesis and first draft for December. Training for developers Difficult task, impressive work from NBB and BBk First training for “new developers” scheduled in Eurostat September (Trainers: BBk, NBB, Insee) SACE 10

11 On the Agenda (3) Plug-ins Difficult: need to “become a developer”
First draft for governance of new Plug-ins available Ongoing tests on the Benchmarking plug-in (ONS leader) SAUG will propose a prioritized list of user requests First works on new Plug-ins: Output and Quality reporting (Insee – Istat) Calendar effects (Insee-NBB) Difficult: need to “become a developer”


Download ppt "SAUG and SACE: Status Report"

Similar presentations


Ads by Google