Presentation is loading. Please wait.

Presentation is loading. Please wait.

Production Engineering Presentation

Similar presentations


Presentation on theme: "Production Engineering Presentation"— Presentation transcript:

1 Production Engineering Presentation
GyeongSang National University Production Engineering Presentation Name : Lee Jong-Hee Major : Mechanical Engineering Date :

2 Contents 1. Company Information (TONGMYUNG Industrial Machine ) 1.1 Production 1.2 Recruitment 2. Company Information (HanGIS) 2.1 Production 2.2 Recruitment 3. Campany Information (GyeongNam Metal) 3.1 Production 3.2 Recruitment ㆍRerence 2/16

3 1.Company Information TONGMYUNG Industrial Machine Type of business : Hydraulic equipment manufacturing Average salary : 30~50 million won ( ) Address : ChangWon city in GyeongNam Company total sales : 10~50 billion won Establishment date : Number of employee : 30~40 people Representative : Choi in-woo 3/16

4 1.1 Production Die Forging Press
Die Forging Press Feature 1) This press is accuracy for difficult forging conditions ) It is useful making precise forming. 4/16

5 Open Die Forging Press Feature 1) The frame is comprised of 2-COLUMN TYPE.    It maximizes the work efficiency. 2) Main cylinder highly resistant to eccentric load. 5/16

6 1.2 Recruitment ㆍ Working condition or qualification Recruitment department : Hydraulic equipment design/install Qualification for application : Above university graduation New employee salary : 27 million won Working hours : 5days a week (Monday~Friday) 08:00 A.M ~ 06:30 P.M ㆍ Recruiting process Necessary documents : Résumé, A letter of self introduction - How to apply : Online - Apply period : Until Application Interview Pass 6/16

7 2.Company Information HanGIS (Hankook General Intelligent System) Type of business : Unmanned Airship Establishment date : Representative : Lee sung-keun Address : Masan city in GyeongNam 7/16

8 2.1 Production Engine Airship
ㆍUse : Advertisement, Take a picture ㆍFeature 1) Can handle by three people 2) Can fly in spite of strong wind 3) Strong fabric 4) High power engine 5) Easy handling 8/16

9 Motor Airship ㆍUse : Advertisement, Event ㆍFeature 1) Can handle it alone 2) Easy to insult helium 3) Easy handling 9/16

10 ㆍ Working condition or qualification Recruitment department : 2D,3D design, Development Qualification for application : Above university graduation Priority : Engineering major, Internship experience Working hours : 6days a week (Monday~Saturday) 08:00 A.M ~ 06:30 P.M ㆍ Recruiting process - Necessary documents : Résumé, A letter of self introduction, Report card - How to apply : Online, Fax, letter - Apply period : Until 2.2 Recruitment Application Personality, Aptitude test Interview Pass 10/16

11 3.Company Information GyeongNam Metal Type of business : Aluminum pressing product, Automobile engine product Manufacturing process : Pressing, Forging, Drawn, Bending, Welding, Surface treatment, Anodizing Address : ChangWon city in GyeongNam Establishment date : Number of employee : 103 people Representative : Park soo-hyun 11/16

12 3.1 Production Roof Rack ㆍUse : Helping to load on the car ㆍFeature Design to customize customers need 12/16

13 Refrigerator Handle TV Frame Bumper 13/16

14 3.2 Recruitment ㆍ Working condition or qualification Recruitment part : Manufacturing technology Qualification for application : more than 3 years experience Priority : Engineering major, relevant working experience Working hours : 6days a week (Monday~Friday) 08:00 A.M ~ 05:00 P.M ㆍ Recruiting process Necessary documents : Résumé, A letter of self introduction, Report card - How to apply : Online - Apply period : Until Application Interview Physical examination 14/16

15 ㆍReference 1) TONGMYUNG Industrial Machine website http://www
ㆍReference 1) TONGMYUNG Industrial Machine website pp.3~6 2) HanGIS website pp.7~10 3) GyeongNam Metal website pp.11~14 15/16

16 GyeongSang National University
Thanks for listening! 16/16


Download ppt "Production Engineering Presentation"

Similar presentations


Ads by Google