Download presentation
Presentation is loading. Please wait.
1
Programming 2100 Series Controllers
2
Relay Control Programming Basics
3
Offsets and Differentials, 2 Setpoints
4
Offsets and Differentials, 1 Setpoint
5
Proportional Control Programming Basics
6
Direct Acting - Output 12mA @ Setpoint
7
Reverse Acting - Output 12mA @ Setpoint
8
Direct Acting - Output 4 or 20mA @ Setpoint
Cooling Heating
9
Reverse Acting - Output 4 or 20mA @ Setpoint
Cooling Heating
10
Controller Programming
11
2100 Series Controller Programming
Menu-by-Menu Examples Follow Along Onscreen Some Slides Printed in Handout Product Manuals in Reference Section Sub-Systems in Ubiquity Manual Sect. 12
12
Factory Defaults Preprogrammed
Programming Basics Factory Defaults Preprogrammed MUST Change Address – Default is Default is 10X (SL2108 => 108) NO LCD on Device – Must Use: Revelation Professional 2.4 Ubiquity on Standalone QD2040 Ubiquity on Internet Ubiquity Mobile **available for download**
13
Programming Options
14
PC Based Software -- Revelation Professional
Menu Driven Programming Use for Network Setup & Testing, Commissioning, & Load Balancing “Read” Before Making Changes “Write” Before Going to NEXT Menu “Write” vs. “Write Half / Write Page” “Load All” & “Save All” Options *** NOT SUPPORTED AS OF JAN 2009 ***
15
PC Based Software -- Insight
Similar to Revelation Professional… Tab Driven Interface Uses Same Datasheets as Ubiquity Use for Network Setup & Testing, Commissioning, & Load Balancing Shows Current Values (no “read” required) “Write Page” Before Going to New Tab *** NEW SOLUTION AS OF JAN 2009 ***
16
Internet Style Software – Ubiquity
Similar to Revelation Professional Single Page for all Programming Info Shows Current Values (no “read”) Writes all Values on “Submit” “Read Controller” Option if Needed Same for Internet Based Site and Standalone QD2040
17
QD2040 Multi-Function Site Comm. Center
Stand-Alone/Dial-In, Dial-Out, or Ethernet Configuring the Controller Network Controller Addressing Setup Web Page Veris Meter (ModBus) Support XML Support Several Models Available REG & –MAX
18
Where to Get Help or Answers
Instructions Sent with Product TCS Basys Controls Catalog Ubiquity Manual Training & Reference Manual Call TCS Directly –
19
2100 Series Controllers
20
SL2105 - Five Channel Lighting Module
Independent, 365-Day Scheduling for ALL 5 Channels Digital & Analog Light Sensor Inputs Analog Current or kW Input 5 Relay Outputs 2 “Demand Limit” Outputs Astronomical Clock
21
SL2108 - Eight Channel Lighting Module
Independent, 365-Day Scheduling for ALL 8 Channels Digital & Analog Light Sensor Inputs Analog Current or kW Input 8 Relay Outputs 2 “Demand Limit” Outputs Astronomical Clock
22
Indoor or Security Lighting Outdoor or Landscape Lights
SL2105 & SL2108 Applications Indoor or Security Lighting Outdoor or Landscape Lights Parking Lot Lights and Signs Daylight Harvesting Lighting Load Shedding Power Monitoring
23
SL2108 – eight channel lighting controller
24
SL2108 – eight channel lighting controller
25
SL2108 – eight channel lighting controller
26
Screenshots or Live View…
Skip to Next Controller…
27
SL2108 – eight channel lighting controller
28
SL2108 – eight channel lighting controller
29
SL2108 – eight channel lighting controller
30
SL2108 – eight channel lighting controller
31
SL2108 – eight channel lighting controller
32
SL2108 – eight channel lighting controller
33
SL2108 – eight channel lighting controller
34
SL2108 – eight channel lighting controller
35
SL2108 – eight channel lighting controller
36
SL2108 – eight channel lighting controller
37
SL2108 – eight channel lighting controller
38
SZ2141 - Refrigeration Controller
Control 1 Cooler with Defrost & 2 Freezers with Defrost and Fan 6 RTD Inputs (-40 to 160°F) 5 Analog Inputs (4 to 20mA) 6 Digital Inputs 8 Relay Control Outputs 1 Relay Alarm Output
39
SZ2141 - Refrigeration Controller
40
SZ2141 - Refrigeration Controller
41
SZ2141 - Refrigeration Controller
42
SZ2141 - Refrigeration Controller
43
SZ2141 - Refrigeration Controller
44
Screenshots or Live View…
Skip to Next Controller…
45
SZ2141 - Refrigeration Controller
46
SZ2141 - Refrigeration Controller
47
SZ2141 - Refrigeration Controller
48
SZ2141 - Refrigeration Controller
49
SZ2141 - Refrigeration Controller
50
SZ2144 – Large Refrigeration Monitor
3 RTD (-40 to 160°F) or Thermistor (-20 to 120°F) Inputs 3 RTD Inputs (20 to 220°F) 2 Analog Inputs (4 to 20mA) 3 Analog Inputs (0 to 5V) 8 Digital Inputs 1 Relay Output (local alarm)
51
SZ2144 – Large Refrigeration Monitor
52
SZ2144 – Large Refrigeration Monitor
53
SZ2144 – Large Refrigeration Monitor
54
SZ2144 – Large Refrigeration Monitor
55
SZ2144 – Large Refrigeration Monitor
56
Screenshots or Live View…
Skip to Next Controller…
57
SZ2144 – Large Refrigeration Monitor
58
SZ2144 – Large Refrigeration Monitor
59
SZ2144 – Large Refrigeration Monitor
60
SZ2144 – Large Refrigeration Monitor
61
SZ2144 – Large Refrigeration Monitor
62
Control 4 Boilers with Chiller Support
SZ Boiler Controller Control 4 Boilers with Chiller Support Automatic Rotation of Boilers & Pumps 365-Day Scheduling 6 RTD & 5 Digital Inputs 1 Analog Input (4 to 20mA) 2 Analog Outputs (4 to 20mA) 9 Relay Outputs
63
One or Two Boilers with Reset
SZ2165 Application SZ Boiler Controller One or Two Boilers with Reset
64
SZ Boiler Controller
65
SZ Boiler Controller
66
SZ Boiler Controller
67
SZ Boiler Controller
68
SZ Boiler Controller
69
SZ Boiler Controller
70
SZ Boiler Controller
71
Screenshots or Live View…
Skip to Next Controller…
72
SZ Boiler Controller
73
SZ Boiler Controller
74
SZ Boiler Controller
75
SZ Boiler Controller
76
SZ Boiler Controller
77
SZ Boiler Controller
78
SZ Boiler Controller
79
SZ2166 - Chiller Controller
Stage 4 Chillers with Boiler Support Automatic Rotation of Chillers & Pumps 365-Day Scheduling 6 RTD Inputs 5 Digital Inputs 2 Analog Outputs (4 to 20mA) 9 Relay Outputs
80
SZ2166 - Chiller Controller
81
SZ2166 - Chiller Controller
82
SZ2166 - Chiller Controller
83
SZ2166 - Chiller Controller
84
SZ2166 - Chiller Controller
85
SZ2166 - Chiller Controller
86
SZ2166 - Chiller Controller
87
Screenshots or Live View…
Skip to Next Controller…
88
SZ2166 - Chiller Controller
89
SZ2166 - Chiller Controller
90
SZ2166 - Chiller Controller
91
SZ2166 - Chiller Controller
92
SZ2166 - Chiller Controller
93
SZ2166 - Chiller Controller
94
SZ2166 - Chiller Controller
95
SZ2161 - Heat Pump Water Loop Controller
Control 4 Boilers & a Water Tower Automatic Rotation of Boilers & Pumps 365-Day Scheduling 6 RTD Inputs 5 Digital Inputs 12 Relay Outputs 2 Analog Outputs (4 to 20mA)
96
SZ2161 Application Cooling Tower
97
SZ2161 - Heat Pump Water Loop Controller
98
SZ2161 - Heat Pump Water Loop Controller
99
SZ2161 - Heat Pump Water Loop Controller
100
SZ2161 - Heat Pump Water Loop Controller
101
SZ2161 - Heat Pump Water Loop Controller
102
Screenshots or Live View…
PLUS Loop Sub-System and Supply Loop Sub-System Skip to Next Controller…
103
SZ2161 - Heat Pump Water Loop Controller
104
SZ2161 - Heat Pump Water Loop Controller
105
SZ2161 - Heat Pump Water Loop Controller
106
SZ2161 - Heat Pump Water Loop Controller
107
SZ2161 - Heat Pump Water Loop Controller
108
SZ2161 - Heat Pump Water Loop Controller
109
HVAC Sub-Systems – Loop Control Setup Guide
Click “Create Loop System” button Select sub-system definition (Loop Controls) Enter a descriptive name for sub-system Select master & secondary master controllers from drop-downs (only appropriate, available controllers will be shown) Select fallback flow switch & related control point from drop-downs Select the desired master controller schedule from drop-down Click the “Submit” button
110
HVAC Sub-Systems – Loop Control
111
HVAC Sub-Systems – Loop Control
112
HVAC Sub-Systems – Loop Control
113
SZ2181 - Air Handling Unit Controller
Enthalpy Based Economizer Option 365-Day Scheduling 6 RTD & 5 Digital Inputs 4 Analog Inputs (4 to 20mA) 3 Analog Outputs (4 to 20mA) 2 Heat & 2 Cool Stages 2 Selectable Heat and/or Cool Stages
114
SZ2182 – Advanced AHU Controller
Enthalpy Based Economizer Option 365-Day Scheduling 6 RTD & 5 Digital Inputs 4 Analog Inputs (4 to 20mA) 4 Analog Outputs (4 to 20mA) 2 Heat & 2 Cool Stages 2 Selectable Heat and/or Cool Stages
115
Face & Bypass Damper Control Static Pressure Control
SZ2182 Applications Dehumidification Face & Bypass Damper Control Static Pressure Control Heat Pump with Economizer Control
116
SZ2181 - Air Handling Unit Controller
117
SZ2181 - Air Handling Unit Controller
118
SZ2181 - Air Handling Unit Controller
119
SZ2181 - Air Handling Unit Controller
120
SZ2181 - Air Handling Unit Controller
121
Screenshots or Live View…
PLUS VAV Sub-System and Superzone™ CZS Sub-System
122
SZ2181 - Air Handling Unit Controller
123
SZ2181 - Air Handling Unit Controller
124
SZ2181 - Air Handling Unit Controller
125
SZ2181 - Air Handling Unit Controller
126
SZ2181 - Air Handling Unit Controller
127
SZ2181 - Air Handling Unit Controller
128
HVAC Sub-Systems – VAV System Setup Guide
Click “Create VAV System” button Click “Add Sub-system” button Click “Controllers” to expand table of options Click “Controller Selection” to expand table Select controllers to include in sub-system (only allowable controllers are selectable in this list) Click “Controller Detail” to expand table Select units for Discharge Air Temp. Sharing Click “System Parameters” to expand table Enter a descriptive name for sub-system
129
HVAC Sub-Systems – VAV System Setup Guide
Select master/main controller from drop-down (only appropriate, available controllers will be shown) Set other “System Parameter” options: Occupied Mode Operation Unoccupied Mode Operation VAV System Type (pressure independent for this example) Duct Static Pressure Controller Backup Discharge Air Sensor Warm Up Mode Operation Morning Warm Up Termination Time/Temp & Options Secondary Boiler & Chiller Master Controllers Click “Submit” button
130
HVAC Sub-Systems – VAV System
131
HVAC Sub-Systems – VAV System
132
HVAC Sub-Systems – CZS System Setup Guide
Click “Create Superzone System” button Click “Add Sub-system” button Click “Controllers” to expand table of options Click “Controller Selection” to expand table Select controllers to include in sub-system (only allowable controllers are selectable in this list) Click “Controller Detail” to expand table Select units for Discharge Air Temp Sharing & for Voting functions Click “System Parameters” to expand table
133
HVAC Sub-Systems – CZS System Setup Guide
Enter a descriptive name for sub-system Select master/main controller from drop-down (only appropriate, available controllers will be shown) Set other “System Parameter” options: Occupied Mode Operation Cool Priority Mode Operation Heat Priority Mode Operation Voting Mode Operation Unoccupied Mode Operation Backup Discharge Air Sensor Bypass Damper Controller Minimum Demand
134
HVAC Sub-Systems – CZS System Setup Guide
Set other “System Parameter” options: (cont’d) Tie Break Controller Priority Zone Controller Majority Maximum Run Time Minority Maximum Run Time Enable Hot Deck/Cold Deck Secondary Boiler and Chiller Master Controllers Hot Deck/Cold Deck Unoccupied Options Click “Demand Proportioning” to expand table & set desired options Click “Submit” button
135
HVAC Sub-Systems – Superzone™ System
136
HVAC Sub-Systems – Superzone™ System
137
HVAC Sub-Systems – Superzone™ System
138
Where to Get Help or Answers
Instructions Sent with Product TCS Basys Controls Catalog Ubiquity Manual Training & Reference Manual Call TCS Directly –
139
Sales and Marketing
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.